English  |  正體中文  |  简体中文  |  Total items :0  
Visitors :  52769549    Online Users :  652
Project Commissioned by the Ministry of Education
Project Executed by National Taiwan University Library
 
臺灣學術機構典藏系統 (Taiwan Academic Institutional Repository, TAIR)
About TAIR

Browse By

News

Copyright

Related Links

"wang k j"

Return to Browse by Author
Sorting by Title Sort by Date

Showing items 136-185 of 225  (5 Page(s) Totally)
<< < 1 2 3 4 5 > >>
View [10|25|50] records per page

Institution Date Title Author
國立臺灣科技大學 2008 Efficient forecasting model for company performance—X company case study Wee, M. H. ; Huang, W. C. ; Wang, K. -J.
國立臺灣科技大學 2008 Knowledge management centric intelligent manufacturing systems for semiconductor manufacturing services industry Hou, T. C. ; Gong, D. C. ; Wang, K. -J. ; ShekharJha, V.
國立臺灣科技大學 2008 An integrated facility-design model for the generator-manufacturing industry Wang, K. -J. ; Chen, K. H.
國立臺灣科技大學 2008 Optimal three-level supply chain inventory model considering strategic alliances and compensation policy Yu, J. C. P. ; Wee, H. M. ; Wang, K. -J. ; Widyadana, G. A.
國立臺灣科技大學 2008 Using an AI approach to solve an integrated two-echelon deteriorating inventory model Wee, H. M. ; Yu, J. C. P. ; Wang, K. -J. ; Widyadana, G. A.
國立臺灣科技大學 2008 Navigating the new product process from strategic viewpoint Wang, K. -J. ; Lee, Y. H. ; Wang, S.
國立臺灣科技大學 2008 An integrated three-echelon supply chain inventory model with compensation policy for deteriorating items Yu, Jonas C. P. ; Wang, K. -J. ; Wee, H. M. ; Lin, Y. S.
國立臺灣科技大學 2008 An integrated three-echelon supply chain model for deteriorating items via simulated annealing method Yu J.C.P.; Wee H.M.; Wang K.J.
國立臺灣科技大學 2008 Analytic solutions of a two-dimensional rectangular heat equation with a heat source Srivastava, H.M.;Kung, K.Y.;Wang, K.-J.
國立臺灣科技大學 2008 Supply chain partnership for Three-Echelon deteriorating inventory model Yu, J.C.P.;Wee, H.M.;Wang, K.J.
國立臺灣科技大學 2008 An integrated facility-design model for the generator-manufacturing industry Wang, K.-J.;Chen, K.-H.
國立臺灣科技大學 2008 Design of an agent-based distant and distributed manufacturing control system Wang, K.-J.
國立臺灣海洋大學 2008 Effects of Tip Grouting on Capacity of Shafts Socket in Gravel Layer Lin, S.S;Liao, J.C;Wang, K.J;Chang, Y.H
臺大學術典藏 2008 Mutations of T-cell epitopes in the hepatitis B virus surface gene in children with chronic infection and hepatocellular carcinoma Young N.-C.;Tsuei D.-J.;Wang K.-J.;HUEY-LING CHEN;Tung Y.-C.;Hsu H.-Y.;Chang M.-H.;Ni Y.-H.; Ni Y.-H.; Young N.-C.; Tsuei D.-J.; Chang M.-H.; Hsu H.-Y.; Tung Y.-C.; HUEY-LING CHEN; Wang K.-J.
臺大學術典藏 2008 Mutations of T-cell epitopes in the hepatitis B virus surface gene in children with chronic infection and hepatocellular carcinoma Young N.-C.; Tsuei D.-J.; Wang K.-J.; Chen H.-L.; Tung Y.-C.; Chang M.-H.; Hsu H.-Y.; YEN-HSUAN NI; Yen-Hsuan Ni;Chang M.-H.;Hsu H.-Y.;Tung Y.-C.;Chen H.-L.;Wang K.-J.;Tsuei D.-J.;Young N.-C.
國立東華大學 2007-09-20 A Neural Network Based Approach for Tolerance Analysis Chih, W. H.; Fu, J. C.; Wang, K. J.; 池文海;傅家啟;王孔政
國立東華大學 2007-07-11 Impact analysis of new product development under different supplier relationships Lee, Y.-H.; Wang, K.-J.; Wang, Shu-Chuan Sophia; 王淑娟
國立臺灣大學 2007-02 Networked Hybrid Simulation of Large-scale Structures in Taiwan Tsai, K.C.; Hsieh, S.H.; Yang, Y.S.; Wang, K.J.
國立臺灣大學 2007-02 ISEE: Internet-based Simulation for Earthquake Engineering—Part II: The application protocol approach Wang K.J.; Tsai K.C.; Wang S.J.; Cheng W.C.; Yang, Y.S.
國立臺灣科技大學 2007 A resource portfolio model for equipment investment and allocation of semiconductor testing industry Wang, K. -J. ; Wang, S. M. ; Yang, S. -J.
國立臺灣科技大學 2007 Resource allocation by genetic algorithm with fuzzy inference Wang, K. -J. ; Lin, Y. S.
國立臺灣科技大學 2007 A neural network based approach for tolerance analysis Chih, W. -H. ; Fu, J. ; Wang, K. -J.
國立臺灣科技大學 2007 Resource portfolio planning of make-to-stock products using a constraint programming based genetic algorithm Wang, S. -M. ; Chen, J. ; Wang, K. -J.
國立臺灣科技大學 2007 Resource Portfolio Planning of Make-to-Stock Products Using a Constraint Programming-Based Genetic Algorithm Wang, S. M. ; Chen, J. C. ; Wang, K. J.
國立臺灣科技大學 2007 Agent-based single-loop interbay control in semiconductor manufacturing Wang, K. -J. ; Lin, J. T. ; Weigert G.
國立臺灣科技大學 2007 Operating an effective resource allocation for wire bonders in semiconductor assembly industry Wang, K. -J. ; Lee, S. -J. ; Yeh, C. -F. ; Huang, T. -C.
國立臺灣科技大學 2007 Analytic solutions of a two-dimensional rectangular heat equation Srivastava H. M. ; Kung, K. Y. ; Wang, K. -J.
國立臺灣科技大學 2007 Using artificial neural network in multi-agent supply chain systems Chen, H. C. ; Wee, H. M. ; Wang, K. -J. ; Hsieh, Y. -H.
國立臺灣科技大學 2007 Prototyping an agent-based distant manufacturing control system Wang, K. -J.
國立臺灣科技大學 2007 An agent-based prototype of asynchronous distance e-learning system for facilities planning courses Wang, K. -J.
國立臺灣科技大學 2007 Impact analysis of new product development under different supplier relationships Lee, Y. -H. ; Wang, S. ; Wang, K. -J.
國立臺灣科技大學 2007 The effects of inflation and time value of money on a production model with a random product life cycle Yu, Jonas C. P. ; Wee, H. M. ; Wang, K. -J. ; Chang, W. C.
國立臺灣科技大學 2007 Prototyping an agent-based distant manufacturing control system Wang K.-J.
國立臺灣科技大學 2007 Using artificial neural network in multi-agent supply chain systems Chen H.C.; Wee H.M.; Wang K.-J.; Hsieh Y.-H.
國立臺灣科技大學 2007 An agent-based prototype of asynchronous distance e-learning system for facilities planning courses Wang K.-J.
國立臺灣科技大學 2007 Resource allocation by genetic algorithm with fuzzy inference Wang, K.-J.;Lin, Y.-S.
國立臺灣科技大學 2007 A neural network based approach for tolerance analysis Chih, W.-H.;Fu, J.;Wang, K.-J.
國立臺灣科技大學 2007 A resource portfolio model for equipment investment and allocation of semiconductor testing industry Wang, K.-J.;Wang, S.-M.;Yang, S.-J.
國立臺灣科技大學 2007 Operating an effective resource allocation for wire bonders in the semiconductor assembly industry Wang, K.-J.;Lee, S.-J.;Yeh, C.-F.;Huang, T.-C.
國立臺灣科技大學 2007 Agent-based interbay system control for a single-loop semiconductor manufacturing fab Wang, K.-J.;Lin, J.T.;Weigert, G.
國立臺灣大學 2007 ISEE: Internet-based Simulation for Earthquake Engineering, Part I: Database Approach Yang, Y. S.; Hsieh, S. H.; Tsai, K. C.; Wang, S. J.; Wang, K. J.; Cheng, W. C.; Hsu, C. W.
國立臺灣科技大學 2006 Design and evaluation of agent’s 3 negotiation-attitude prediction model Cheng, T. -W. ; Rau, S. ; Wang, K. -J.
國立臺灣科技大學 2006 Design of bid construction mechanism for job flow time reduction in auction-based shop-floor control Systems Veeramani D. ; Wang, K. -J.
國立臺灣科技大學 2006 Non-linear stochastic optimization using genetic algorithm for portfolio selection Wang, S. -M. ; Chen, J. -C. ; Wee, H. -M. ; Wang, K. -J.
國立臺灣科技大學 2006 Non-Linear Stochastic Optimization Using Genetic Algorithm for Portfolio Selection Wang, S. M. ; Chen, J. C. ; Wee, H. M. ; Wang, K. J.
國立臺灣科技大學 2006 A coordinated algorithm for deciding order-up-to-level of a serial supply chain in an uncertain environment Wang, K. -J. ; Chih, W. H. ; Hwang, K.
國立臺灣科技大學 2006 An integrated production-inventory model for deteriorating item with imperfect quality and shortage backordering considerations Wee, H. M. ; Yu, J. C. P. ; Wang, K. -J.
國立臺灣科技大學 2006 Coordinated resource allocation by mutual outsourcing in decentralized supply chain Wang, K. -J. ; Wee, H. M. ; Yu, J. ; Kung, K. Y.
國立臺灣科技大學 2006 The sustainability of supply chain 7 collaborations through pricing and warranty strategies Wee, H. M. ; Chung, C. J. ; Wang, K. -J.
國立臺灣科技大學 2006 A MULTI-CHECK ACCOUNTING SYSTEM EMPOWERED BY KNOWLEDGE MANAGEMENT SYSTEM Wang, K. -J. ; Huang, S. -Y.

Showing items 136-185 of 225  (5 Page(s) Totally)
<< < 1 2 3 4 5 > >>
View [10|25|50] records per page