| 國立臺灣科技大學 |
2008 |
Efficient forecasting model for company performance—X company case study
|
Wee, M. H. ; Huang, W. C. ; Wang, K. -J. |
| 國立臺灣科技大學 |
2008 |
Knowledge management centric intelligent manufacturing systems for semiconductor manufacturing services industry
|
Hou, T. C. ; Gong, D. C. ; Wang, K. -J. ; ShekharJha, V. |
| 國立臺灣科技大學 |
2008 |
An integrated facility-design model for the generator-manufacturing industry
|
Wang, K. -J. ; Chen, K. H. |
| 國立臺灣科技大學 |
2008 |
Optimal three-level supply chain inventory model considering strategic alliances and compensation policy
|
Yu, J. C. P. ; Wee, H. M. ; Wang, K. -J. ; Widyadana, G. A. |
| 國立臺灣科技大學 |
2008 |
Using an AI approach to solve an integrated two-echelon deteriorating inventory model
|
Wee, H. M. ; Yu, J. C. P. ; Wang, K. -J. ; Widyadana, G. A. |
| 國立臺灣科技大學 |
2008 |
Navigating the new product process from strategic viewpoint
|
Wang, K. -J. ; Lee, Y. H. ; Wang, S. |
| 國立臺灣科技大學 |
2008 |
An integrated three-echelon supply chain inventory model with compensation policy for deteriorating items
|
Yu, Jonas C. P. ; Wang, K. -J. ; Wee, H. M. ; Lin, Y. S. |
| 國立臺灣科技大學 |
2008 |
An integrated three-echelon supply chain model for deteriorating items via simulated annealing method
|
Yu J.C.P.; Wee H.M.; Wang K.J. |
| 國立臺灣科技大學 |
2008 |
Analytic solutions of a two-dimensional rectangular heat equation with a heat source
|
Srivastava, H.M.;Kung, K.Y.;Wang, K.-J. |
| 國立臺灣科技大學 |
2008 |
Supply chain partnership for Three-Echelon deteriorating inventory model
|
Yu, J.C.P.;Wee, H.M.;Wang, K.J. |
| 國立臺灣科技大學 |
2008 |
An integrated facility-design model for the generator-manufacturing industry
|
Wang, K.-J.;Chen, K.-H. |
| 國立臺灣科技大學 |
2008 |
Design of an agent-based distant and distributed manufacturing control system
|
Wang, K.-J. |
| 國立臺灣海洋大學 |
2008 |
Effects of Tip Grouting on Capacity of Shafts Socket in Gravel Layer
|
Lin, S.S;Liao, J.C;Wang, K.J;Chang, Y.H |
| 臺大學術典藏 |
2008 |
Mutations of T-cell epitopes in the hepatitis B virus surface gene in children with chronic infection and hepatocellular carcinoma
|
Young N.-C.;Tsuei D.-J.;Wang K.-J.;HUEY-LING CHEN;Tung Y.-C.;Hsu H.-Y.;Chang M.-H.;Ni Y.-H.; Ni Y.-H.; Young N.-C.; Tsuei D.-J.; Chang M.-H.; Hsu H.-Y.; Tung Y.-C.; HUEY-LING CHEN; Wang K.-J. |
| 臺大學術典藏 |
2008 |
Mutations of T-cell epitopes in the hepatitis B virus surface gene in children with chronic infection and hepatocellular carcinoma
|
Young N.-C.; Tsuei D.-J.; Wang K.-J.; Chen H.-L.; Tung Y.-C.; Chang M.-H.; Hsu H.-Y.; YEN-HSUAN NI; Yen-Hsuan Ni;Chang M.-H.;Hsu H.-Y.;Tung Y.-C.;Chen H.-L.;Wang K.-J.;Tsuei D.-J.;Young N.-C. |
| 國立東華大學 |
2007-09-20 |
A Neural Network Based Approach for Tolerance Analysis
|
Chih, W. H.; Fu, J. C.; Wang, K. J.; 池文海;傅家啟;王孔政 |
| 國立東華大學 |
2007-07-11 |
Impact analysis of new product development under different supplier relationships
|
Lee, Y.-H.; Wang, K.-J.; Wang, Shu-Chuan Sophia; 王淑娟 |
| 國立臺灣大學 |
2007-02 |
Networked Hybrid Simulation of Large-scale Structures in Taiwan
|
Tsai, K.C.; Hsieh, S.H.; Yang, Y.S.; Wang, K.J. |
| 國立臺灣大學 |
2007-02 |
ISEE: Internet-based Simulation for Earthquake Engineering—Part II: The application protocol approach
|
Wang K.J.; Tsai K.C.; Wang S.J.; Cheng W.C.; Yang, Y.S. |
| 國立臺灣科技大學 |
2007 |
A resource portfolio model for equipment investment and allocation of semiconductor testing industry
|
Wang, K. -J. ; Wang, S. M. ; Yang, S. -J. |
| 國立臺灣科技大學 |
2007 |
Resource allocation by genetic algorithm with fuzzy inference
|
Wang, K. -J. ; Lin, Y. S. |
| 國立臺灣科技大學 |
2007 |
A neural network based approach for tolerance analysis
|
Chih, W. -H. ; Fu, J. ; Wang, K. -J. |
| 國立臺灣科技大學 |
2007 |
Resource portfolio planning of make-to-stock products using a constraint programming based genetic algorithm
|
Wang, S. -M. ; Chen, J. ; Wang, K. -J. |
| 國立臺灣科技大學 |
2007 |
Resource Portfolio Planning of Make-to-Stock Products Using a Constraint Programming-Based Genetic Algorithm
|
Wang, S. M. ; Chen, J. C. ; Wang, K. J. |
| 國立臺灣科技大學 |
2007 |
Agent-based single-loop interbay control in semiconductor manufacturing
|
Wang, K. -J. ; Lin, J. T. ; Weigert G. |
| 國立臺灣科技大學 |
2007 |
Operating an effective resource allocation for wire bonders in semiconductor assembly industry
|
Wang, K. -J. ; Lee, S. -J. ; Yeh, C. -F. ; Huang, T. -C. |
| 國立臺灣科技大學 |
2007 |
Analytic solutions of a two-dimensional rectangular heat equation
|
Srivastava H. M. ; Kung, K. Y. ; Wang, K. -J. |
| 國立臺灣科技大學 |
2007 |
Using artificial neural network in multi-agent supply chain systems
|
Chen, H. C. ; Wee, H. M. ; Wang, K. -J. ; Hsieh, Y. -H. |
| 國立臺灣科技大學 |
2007 |
Prototyping an agent-based distant manufacturing control system
|
Wang, K. -J. |
| 國立臺灣科技大學 |
2007 |
An agent-based prototype of asynchronous distance e-learning system for facilities planning courses
|
Wang, K. -J. |
| 國立臺灣科技大學 |
2007 |
Impact analysis of new product development under different supplier relationships
|
Lee, Y. -H. ; Wang, S. ; Wang, K. -J. |
| 國立臺灣科技大學 |
2007 |
The effects of inflation and time value of money on a production model with a random product life cycle
|
Yu, Jonas C. P. ; Wee, H. M. ; Wang, K. -J. ; Chang, W. C. |
| 國立臺灣科技大學 |
2007 |
Prototyping an agent-based distant manufacturing control system
|
Wang K.-J. |
| 國立臺灣科技大學 |
2007 |
Using artificial neural network in multi-agent supply chain systems
|
Chen H.C.; Wee H.M.; Wang K.-J.; Hsieh Y.-H. |
| 國立臺灣科技大學 |
2007 |
An agent-based prototype of asynchronous distance e-learning system for facilities planning courses
|
Wang K.-J. |
| 國立臺灣科技大學 |
2007 |
Resource allocation by genetic algorithm with fuzzy inference
|
Wang, K.-J.;Lin, Y.-S. |
| 國立臺灣科技大學 |
2007 |
A neural network based approach for tolerance analysis
|
Chih, W.-H.;Fu, J.;Wang, K.-J. |
| 國立臺灣科技大學 |
2007 |
A resource portfolio model for equipment investment and allocation of semiconductor testing industry
|
Wang, K.-J.;Wang, S.-M.;Yang, S.-J. |
| 國立臺灣科技大學 |
2007 |
Operating an effective resource allocation for wire bonders in the semiconductor assembly industry
|
Wang, K.-J.;Lee, S.-J.;Yeh, C.-F.;Huang, T.-C. |
| 國立臺灣科技大學 |
2007 |
Agent-based interbay system control for a single-loop semiconductor manufacturing fab
|
Wang, K.-J.;Lin, J.T.;Weigert, G. |
| 國立臺灣大學 |
2007 |
ISEE: Internet-based Simulation for Earthquake Engineering, Part I: Database Approach
|
Yang, Y. S.; Hsieh, S. H.; Tsai, K. C.; Wang, S. J.; Wang, K. J.; Cheng, W. C.; Hsu, C. W. |
| 國立臺灣科技大學 |
2006 |
Design and evaluation of agent’s 3 negotiation-attitude prediction model
|
Cheng, T. -W. ; Rau, S. ; Wang, K. -J. |
| 國立臺灣科技大學 |
2006 |
Design of bid construction mechanism for job flow time reduction in auction-based shop-floor control Systems
|
Veeramani D. ; Wang, K. -J. |
| 國立臺灣科技大學 |
2006 |
Non-linear stochastic optimization using genetic algorithm for portfolio selection
|
Wang, S. -M. ; Chen, J. -C. ; Wee, H. -M. ; Wang, K. -J. |
| 國立臺灣科技大學 |
2006 |
Non-Linear Stochastic Optimization Using Genetic Algorithm for Portfolio Selection
|
Wang, S. M. ; Chen, J. C. ; Wee, H. M. ; Wang, K. J. |
| 國立臺灣科技大學 |
2006 |
A coordinated algorithm for deciding order-up-to-level of a serial supply chain in an uncertain environment
|
Wang, K. -J. ; Chih, W. H. ; Hwang, K. |
| 國立臺灣科技大學 |
2006 |
An integrated production-inventory model for deteriorating item with imperfect quality and shortage backordering considerations
|
Wee, H. M. ; Yu, J. C. P. ; Wang, K. -J. |
| 國立臺灣科技大學 |
2006 |
Coordinated resource allocation by mutual outsourcing in decentralized supply chain
|
Wang, K. -J. ; Wee, H. M. ; Yu, J. ; Kung, K. Y. |
| 國立臺灣科技大學 |
2006 |
The sustainability of supply chain 7 collaborations through pricing and warranty strategies
|
Wee, H. M. ; Chung, C. J. ; Wang, K. -J. |
| 國立臺灣科技大學 |
2006 |
A MULTI-CHECK ACCOUNTING SYSTEM EMPOWERED BY KNOWLEDGE MANAGEMENT SYSTEM
|
Wang, K. -J. ; Huang, S. -Y. |