| 國立臺灣科技大學 |
2007 |
Resource allocation by genetic algorithm with fuzzy inference
|
Wang, K. -J. ; Lin, Y. S. |
| 國立臺灣科技大學 |
2007 |
A neural network based approach for tolerance analysis
|
Chih, W. -H. ; Fu, J. ; Wang, K. -J. |
| 國立臺灣科技大學 |
2007 |
Resource portfolio planning of make-to-stock products using a constraint programming based genetic algorithm
|
Wang, S. -M. ; Chen, J. ; Wang, K. -J. |
| 國立臺灣科技大學 |
2007 |
Resource Portfolio Planning of Make-to-Stock Products Using a Constraint Programming-Based Genetic Algorithm
|
Wang, S. M. ; Chen, J. C. ; Wang, K. J. |
| 國立臺灣科技大學 |
2007 |
Agent-based single-loop interbay control in semiconductor manufacturing
|
Wang, K. -J. ; Lin, J. T. ; Weigert G. |
| 國立臺灣科技大學 |
2007 |
Operating an effective resource allocation for wire bonders in semiconductor assembly industry
|
Wang, K. -J. ; Lee, S. -J. ; Yeh, C. -F. ; Huang, T. -C. |
| 國立臺灣科技大學 |
2007 |
Analytic solutions of a two-dimensional rectangular heat equation
|
Srivastava H. M. ; Kung, K. Y. ; Wang, K. -J. |
| 國立臺灣科技大學 |
2007 |
Using artificial neural network in multi-agent supply chain systems
|
Chen, H. C. ; Wee, H. M. ; Wang, K. -J. ; Hsieh, Y. -H. |
| 國立臺灣科技大學 |
2007 |
Prototyping an agent-based distant manufacturing control system
|
Wang, K. -J. |
| 國立臺灣科技大學 |
2007 |
An agent-based prototype of asynchronous distance e-learning system for facilities planning courses
|
Wang, K. -J. |
| 國立臺灣科技大學 |
2007 |
Impact analysis of new product development under different supplier relationships
|
Lee, Y. -H. ; Wang, S. ; Wang, K. -J. |
| 國立臺灣科技大學 |
2007 |
The effects of inflation and time value of money on a production model with a random product life cycle
|
Yu, Jonas C. P. ; Wee, H. M. ; Wang, K. -J. ; Chang, W. C. |
| 國立臺灣科技大學 |
2007 |
Prototyping an agent-based distant manufacturing control system
|
Wang K.-J. |
| 國立臺灣科技大學 |
2007 |
Using artificial neural network in multi-agent supply chain systems
|
Chen H.C.; Wee H.M.; Wang K.-J.; Hsieh Y.-H. |
| 國立臺灣科技大學 |
2007 |
An agent-based prototype of asynchronous distance e-learning system for facilities planning courses
|
Wang K.-J. |
| 國立臺灣科技大學 |
2007 |
Resource allocation by genetic algorithm with fuzzy inference
|
Wang, K.-J.;Lin, Y.-S. |
| 國立臺灣科技大學 |
2007 |
A neural network based approach for tolerance analysis
|
Chih, W.-H.;Fu, J.;Wang, K.-J. |
| 國立臺灣科技大學 |
2007 |
A resource portfolio model for equipment investment and allocation of semiconductor testing industry
|
Wang, K.-J.;Wang, S.-M.;Yang, S.-J. |
| 國立臺灣科技大學 |
2007 |
Operating an effective resource allocation for wire bonders in the semiconductor assembly industry
|
Wang, K.-J.;Lee, S.-J.;Yeh, C.-F.;Huang, T.-C. |
| 國立臺灣科技大學 |
2007 |
Agent-based interbay system control for a single-loop semiconductor manufacturing fab
|
Wang, K.-J.;Lin, J.T.;Weigert, G. |
| 國立臺灣大學 |
2007 |
ISEE: Internet-based Simulation for Earthquake Engineering, Part I: Database Approach
|
Yang, Y. S.; Hsieh, S. H.; Tsai, K. C.; Wang, S. J.; Wang, K. J.; Cheng, W. C.; Hsu, C. W. |
| 國立臺灣科技大學 |
2006 |
Design and evaluation of agent’s 3 negotiation-attitude prediction model
|
Cheng, T. -W. ; Rau, S. ; Wang, K. -J. |
| 國立臺灣科技大學 |
2006 |
Design of bid construction mechanism for job flow time reduction in auction-based shop-floor control Systems
|
Veeramani D. ; Wang, K. -J. |
| 國立臺灣科技大學 |
2006 |
Non-linear stochastic optimization using genetic algorithm for portfolio selection
|
Wang, S. -M. ; Chen, J. -C. ; Wee, H. -M. ; Wang, K. -J. |
| 國立臺灣科技大學 |
2006 |
Non-Linear Stochastic Optimization Using Genetic Algorithm for Portfolio Selection
|
Wang, S. M. ; Chen, J. C. ; Wee, H. M. ; Wang, K. J. |