| 國立臺灣科技大學 |
2007 |
Resource allocation by genetic algorithm with fuzzy inference
|
Wang, K.-J.;Lin, Y.-S. |
| 國立臺灣科技大學 |
2007 |
A neural network based approach for tolerance analysis
|
Chih, W.-H.;Fu, J.;Wang, K.-J. |
| 國立臺灣科技大學 |
2007 |
A resource portfolio model for equipment investment and allocation of semiconductor testing industry
|
Wang, K.-J.;Wang, S.-M.;Yang, S.-J. |
| 國立臺灣科技大學 |
2007 |
Operating an effective resource allocation for wire bonders in the semiconductor assembly industry
|
Wang, K.-J.;Lee, S.-J.;Yeh, C.-F.;Huang, T.-C. |
| 國立臺灣科技大學 |
2007 |
Agent-based interbay system control for a single-loop semiconductor manufacturing fab
|
Wang, K.-J.;Lin, J.T.;Weigert, G. |
| 國立臺灣大學 |
2007 |
ISEE: Internet-based Simulation for Earthquake Engineering, Part I: Database Approach
|
Yang, Y. S.; Hsieh, S. H.; Tsai, K. C.; Wang, S. J.; Wang, K. J.; Cheng, W. C.; Hsu, C. W. |
| 國立臺灣科技大學 |
2006 |
Design and evaluation of agent’s 3 negotiation-attitude prediction model
|
Cheng, T. -W. ; Rau, S. ; Wang, K. -J. |
| 國立臺灣科技大學 |
2006 |
Design of bid construction mechanism for job flow time reduction in auction-based shop-floor control Systems
|
Veeramani D. ; Wang, K. -J. |
| 國立臺灣科技大學 |
2006 |
Non-linear stochastic optimization using genetic algorithm for portfolio selection
|
Wang, S. -M. ; Chen, J. -C. ; Wee, H. -M. ; Wang, K. -J. |
| 國立臺灣科技大學 |
2006 |
Non-Linear Stochastic Optimization Using Genetic Algorithm for Portfolio Selection
|
Wang, S. M. ; Chen, J. C. ; Wee, H. M. ; Wang, K. J. |
| 國立臺灣科技大學 |
2006 |
A coordinated algorithm for deciding order-up-to-level of a serial supply chain in an uncertain environment
|
Wang, K. -J. ; Chih, W. H. ; Hwang, K. |
| 國立臺灣科技大學 |
2006 |
An integrated production-inventory model for deteriorating item with imperfect quality and shortage backordering considerations
|
Wee, H. M. ; Yu, J. C. P. ; Wang, K. -J. |
| 國立臺灣科技大學 |
2006 |
Coordinated resource allocation by mutual outsourcing in decentralized supply chain
|
Wang, K. -J. ; Wee, H. M. ; Yu, J. ; Kung, K. Y. |
| 國立臺灣科技大學 |
2006 |
The sustainability of supply chain 7 collaborations through pricing and warranty strategies
|
Wee, H. M. ; Chung, C. J. ; Wang, K. -J. |
| 國立臺灣科技大學 |
2006 |
A MULTI-CHECK ACCOUNTING SYSTEM EMPOWERED BY KNOWLEDGE MANAGEMENT SYSTEM
|
Wang, K. -J. ; Huang, S. -Y. |
| 國立臺灣科技大學 |
2006 |
Supply Chain Inventory Strategies Using Fuzzy Neural Network
|
Wang, C. E. ; Chen, J. C. ; Wee, H-M; Wang, K. -J. ; Lin, Y. -S. |
| 國立臺灣科技大學 |
2006 |
A coordinated algorithm for deciding order-up-to-level of a serial supply chain in an uncertain environment, Lecture Notes in Computer Science (LNCS)
|
Wang, K. -J. ; Chih, W. H. ; Hwang, K. |
| 國立臺灣科技大學 |
2006 |
Supply chain inventory strategies using fuzzy neural network
|
Wang C.E.; Chen J.C.; Wee H.-M.; Wang K.-J.; Lin Y.-S. |
| 國立臺灣科技大學 |
2006 |
Coordinated resource allocation by mutual outsourcing in decentralized supply chain
|
Wang K.-J.; Wee H.M.; Yu J.; Kung K.Y. |
| 淡江大學 |
2006 |
Magnetic and Superconducting Properties of Single Crystals of Sr2HoRu1-xCuxO6 Grown from High Temperature Solutions
|
Rao, S. M.; Wang, K. J.; Yen, N. Y.; Chen, Y. Y.; Tsai, C. B.; S. Neeleshwar; Wu, M. K.; Srivastava, J. K.; Ling, M. C.; Liu, H. L.; Ling, D. C. |
| 國立政治大學 |
2006 |
A coordination algorithm for deciding order-up-to level of a serial supply chain in an uncertain environment
|
Wang, K.-J.;Chih, W.-H.;Hwang, Ken |
| 國立臺灣科技大學 |
2005 |
A fuzzy-neural-network model for bidding parameters of auction-based e-market
|
Wang, K. -J. ; Hsu, Y. -H. ; Pan, C. -C. |
| 國立臺灣科技大學 |
2005 |
An economic capacity planning model considering inventory and capital time value
|
Wang, S. -M. ; Wang, K. -J. ; Wee, H. -M. ; Chen, J. -C. |
| 國立臺灣科技大學 |
2005 |
An Economic Capacity Planning Model Considering Inventory and Capital Time Value
|
Wang, S. M. ; Wang, K. J. ; Wee, H. M. ; Chen, J. C. |
| 國立臺灣科技大學 |
2005 |
Production and inventory control with chaotic demands
|
Wang, K. -J. ; Wee, H. M. ; Gao, S. F. ; Chung, S. -L. |
| 國立臺灣科技大學 |
2005 |
A hybrid decision tree and neural network model for knowledge discovery of dispatching rules selection in semiconductor testing industry
|
Wang, K. -J. ; Chen, J. ; Lin, Y. -S. |
| 國立臺灣科技大學 |
2005 |
A Hybrid Knowledge Discovery Model Using Decision Tree and Neural Network for Selecting Dispatching Rules of A Semiconductor Final Testing Factory
|
Wang, K. J. ; Chen, J. C. ; Lin, Y. S. |
| 國立臺灣科技大學 |
2005 |
A fundamental resource allocation model using genetic algorithm under a fuzzy environment
|
Chien, C. -F. ; LinY. -S. ; Chen, J. C. ; Wang, K. -J. |
| 國立臺灣科技大學 |
2005 |
A Fundamental Resource Allocation Model Using Genetic Algorithm under A Fuzzy Environment
|
Lin, Y. S. ; Chen, J. C. ; Wang, K. J. ; Chien, C. F. |
| 國立臺灣科技大學 |
2004 |
Distributed production planning using a graph-based negotiation protocol
|
Wang, K. -J. ; Veeramani D. ; Chen, J. |
| 國立臺灣科技大學 |
2004 |
Knowledge discovery of dispatching rules in semiconductor testing industry
|
LinY. -S. ; Chen, J. C. ; Wang, K. -J. |
| 國立臺灣科技大學 |
2004 |
Knowledge Discovery of Dispatching Rules in Semiconductor Testing Industry
|
Lin, Y. S. ; Chen, J. C. ; Wang, K. J. |
| 國立臺灣科技大學 |
2003 |
Negotiation-based multi-stage production control using distributed shortest path algorithm
|
Wang, K. -J. |
| 國立臺灣科技大學 |
2003 |
Modeling and resolving the joint problem of capacity expansion and allocation with multiple resources and limited budget in semiconductor testing industry
|
Wang, K. -J. ; Hou, T. C. |
| 國立臺灣科技大學 |
2003 |
Designing an Internet-based group decision support system
|
Wang, K. -J. ; Chien, C. F. |
| 國立臺灣科技大學 |
2003 |
Evaluating NDF-based negotiation mechanism within an agent-based environment
|
Wang, K. -J. ; Chou, C. H. |
| 國立臺灣科技大學 |
2002 |
A heuristic algorithm for order-up-to inventory policy under unreliable material supply
|
Wang, K. -J. ; Hwang, K. ; Lo, C. -C. |
| 國立臺灣科技大學 |
2002 |
Capacity expansion and allocation for a semiconductor testing facility with a constrained budget
|
Wang, K. -J. ; Lin, S. H. |
| 中原大學 |
2002 |
Designing an internet-based group decision support system
|
Wang K.-J.;Chien C. F.; |
| 國立臺灣科技大學 |
2001 |
A hospital public transportation system’s route and scheduling planning
|
Gong, D. -C. ; Chiu, C. -H. ; Wang, K. -J. ; Chang, K. -H. ; Chen, H. -F. ; Yang, M. -S. |
| 國立臺灣科技大學 |
2001 |
Modeling of agent-based manufacturing systems
|
Wang, K. -J. ; Chou, C. H. |
| 國立臺灣科技大學 |
2001 |
Chaos in agent-based systems---Illustrations of decision-making regarding to resource selection and agent coalition
|
Wang, K. -J. ; Gao, S. F. |
| 國立臺灣科技大學 |
2001 |
A look-ahead Wagner-Whitin algorithm for chaotic demands
|
Wang, K. -J. ; Wee, H. M. ; Twu, S. H. ; Gao, S. F. |
| 中原大學 |
2001 |
A coordination mechanism based on negotiation decision function for holonic manufacturing systems
|
Wang K.-J.;Wang K. I.; |
| 中原大學 |
2001 |
A prototype of asynchronous distance learning system for facilities planning
|
Wang K.-J.;Wang K. I.; |
| 淡江大學 |
2000-01 |
Adaptive Bayesian Decision Feedback Equalizer for Radio Channel with High-power Amplifier
|
陳巽璋; Wang, K.J. |
| 國立臺灣科技大學 |
2000 |
Distributed conveyer transportation control using a negotiation mechanism
|
Wang, K. -J. ; Cheng, T. Y. |
| 國立臺灣科技大學 |
1998 |
Design of deadlock-free auction protocols for distributed 5 shop-floor control systems
|
Wang, K. -J. |
| 國立臺灣科技大學 |
1998 |
Modeling and simulation of auction based shop floor control using parallel computing
|
Veeramani D. ; Wang, K. -J. ; Rojas J. |
| 國立臺灣科技大學 |
1998 |
A demand-driven shop-floor control model for distributed manufacturing systems
|
Wang, K. -J. |