國立政治大學 |
2006 |
A coordination algorithm for deciding order-up-to level of a serial supply chain in an uncertain environment
|
Wang, K.-J.;Chih, W.-H.;Hwang, Ken |
國立臺灣科技大學 |
2005 |
A fuzzy-neural-network model for bidding parameters of auction-based e-market
|
Wang, K. -J. ; Hsu, Y. -H. ; Pan, C. -C. |
國立臺灣科技大學 |
2005 |
An economic capacity planning model considering inventory and capital time value
|
Wang, S. -M. ; Wang, K. -J. ; Wee, H. -M. ; Chen, J. -C. |
國立臺灣科技大學 |
2005 |
An Economic Capacity Planning Model Considering Inventory and Capital Time Value
|
Wang, S. M. ; Wang, K. J. ; Wee, H. M. ; Chen, J. C. |
國立臺灣科技大學 |
2005 |
Production and inventory control with chaotic demands
|
Wang, K. -J. ; Wee, H. M. ; Gao, S. F. ; Chung, S. -L. |
國立臺灣科技大學 |
2005 |
A hybrid decision tree and neural network model for knowledge discovery of dispatching rules selection in semiconductor testing industry
|
Wang, K. -J. ; Chen, J. ; Lin, Y. -S. |
國立臺灣科技大學 |
2005 |
A Hybrid Knowledge Discovery Model Using Decision Tree and Neural Network for Selecting Dispatching Rules of A Semiconductor Final Testing Factory
|
Wang, K. J. ; Chen, J. C. ; Lin, Y. S. |
國立臺灣科技大學 |
2005 |
A fundamental resource allocation model using genetic algorithm under a fuzzy environment
|
Chien, C. -F. ; LinY. -S. ; Chen, J. C. ; Wang, K. -J. |
國立臺灣科技大學 |
2005 |
A Fundamental Resource Allocation Model Using Genetic Algorithm under A Fuzzy Environment
|
Lin, Y. S. ; Chen, J. C. ; Wang, K. J. ; Chien, C. F. |
國立臺灣科技大學 |
2004 |
Distributed production planning using a graph-based negotiation protocol
|
Wang, K. -J. ; Veeramani D. ; Chen, J. |
國立臺灣科技大學 |
2004 |
Knowledge discovery of dispatching rules in semiconductor testing industry
|
LinY. -S. ; Chen, J. C. ; Wang, K. -J. |
國立臺灣科技大學 |
2004 |
Knowledge Discovery of Dispatching Rules in Semiconductor Testing Industry
|
Lin, Y. S. ; Chen, J. C. ; Wang, K. J. |
國立臺灣科技大學 |
2003 |
Negotiation-based multi-stage production control using distributed shortest path algorithm
|
Wang, K. -J. |
國立臺灣科技大學 |
2003 |
Modeling and resolving the joint problem of capacity expansion and allocation with multiple resources and limited budget in semiconductor testing industry
|
Wang, K. -J. ; Hou, T. C. |
國立臺灣科技大學 |
2003 |
Designing an Internet-based group decision support system
|
Wang, K. -J. ; Chien, C. F. |
國立臺灣科技大學 |
2003 |
Evaluating NDF-based negotiation mechanism within an agent-based environment
|
Wang, K. -J. ; Chou, C. H. |
國立臺灣科技大學 |
2002 |
A heuristic algorithm for order-up-to inventory policy under unreliable material supply
|
Wang, K. -J. ; Hwang, K. ; Lo, C. -C. |
國立臺灣科技大學 |
2002 |
Capacity expansion and allocation for a semiconductor testing facility with a constrained budget
|
Wang, K. -J. ; Lin, S. H. |
中原大學 |
2002 |
Designing an internet-based group decision support system
|
Wang K.-J.;Chien C. F.; |
國立臺灣科技大學 |
2001 |
A hospital public transportation system’s route and scheduling planning
|
Gong, D. -C. ; Chiu, C. -H. ; Wang, K. -J. ; Chang, K. -H. ; Chen, H. -F. ; Yang, M. -S. |
國立臺灣科技大學 |
2001 |
Modeling of agent-based manufacturing systems
|
Wang, K. -J. ; Chou, C. H. |
國立臺灣科技大學 |
2001 |
Chaos in agent-based systems---Illustrations of decision-making regarding to resource selection and agent coalition
|
Wang, K. -J. ; Gao, S. F. |
國立臺灣科技大學 |
2001 |
A look-ahead Wagner-Whitin algorithm for chaotic demands
|
Wang, K. -J. ; Wee, H. M. ; Twu, S. H. ; Gao, S. F. |
中原大學 |
2001 |
A coordination mechanism based on negotiation decision function for holonic manufacturing systems
|
Wang K.-J.;Wang K. I.; |
中原大學 |
2001 |
A prototype of asynchronous distance learning system for facilities planning
|
Wang K.-J.;Wang K. I.; |