|
English
|
正體中文
|
简体中文
|
总笔数 :0
|
|
造访人次 :
52938477
在线人数 :
602
教育部委托研究计画 计画执行:国立台湾大学图书馆
|
|
|
"wang tai yue"的相关文件
显示项目 16-25 / 30 (共3页) << < 1 2 3 > >> 每页显示[10|25|50]项目
| 國立成功大學 |
2006-05 |
Forecasting innovation performance via neural networks - a case of Taiwanese manufacturing industry
|
Wang, Tai-Yue; Chien, Shih-Chien |
| 國立成功大學 |
2006-03 |
Comparison of scheduling efficiency in two/three-machine no-wait flow shop problem using Simulated Annealing and Genetic Algorithm
|
Wang, Tai-Yue; Yang, Yih-Hwang; Lin, Hern-Jiang |
| 國立成功大學 |
2004-11 |
Artificial neural networks to classify mean shifts from multivariate chi(2) chart signals
|
Chen, Long-Hui; Wang, Tai-Yue |
| 國立成功大學 |
2004-04 |
A Research Framework for Evaluating the Competitiveness of Developing Countries: An Example of the Phi
|
Wang, Tai-Yue;Lee, Hsin-Ying;Elvira A. Zamora;Serafin D. Talisayon;Vivien T. Supangco;Ben Paul B. Gutierrez, Epictertus E. Patalinghug |
| 國立成功大學 |
2002-06 |
Mean shifts detection and classification in multivariate process: a neural-fuzzy approach
|
Wang, Tai-Yue; Chen, Long-Hui |
| 國立成功大學 |
2002-02-15 |
Applying the network flow model to evaluate an FMC's throughput
|
Wang, Tai-Yue; Chen, Yue-Li |
| 國立成功大學 |
2001-12 |
Investment in set-up time reduction with time-varying demand
|
Wang, Tai-Yue; Chen, Long-Hui |
| 國立成功大學 |
2001-09 |
A simulated annealing algorithm for facility layout problems under variable demand in Cellular Manufacturing Systems
|
Wang, Tai-Yue; Wu, Kuei-Bin; Liu, Y. W. |
| 國立成功大學 |
2001-08 |
The economic justification of machine changeover time reduction in a manufacturing cell
|
Wang, Tai-Yue; Song, Jun-Yi; Chen, Long-Hui |
| 國立成功大學 |
2001-06 |
A production lot size inventory model for deteriorating items with time-varying demand
|
Wang, Tai-Yue; Chen, Long-Hui |
显示项目 16-25 / 30 (共3页) << < 1 2 3 > >> 每页显示[10|25|50]项目
|