|
English
|
正體中文
|
简体中文
|
总笔数 :0
|
|
造访人次 :
52915137
在线人数 :
558
教育部委托研究计画 计画执行:国立台湾大学图书馆
|
|
|
"wang tai yue"的相关文件
显示项目 21-30 / 30 (共2页) 1 2 > >> 每页显示[10|25|50]项目
| 國立成功大學 |
2002-02-15 |
Applying the network flow model to evaluate an FMC's throughput
|
Wang, Tai-Yue; Chen, Yue-Li |
| 國立成功大學 |
2001-12 |
Investment in set-up time reduction with time-varying demand
|
Wang, Tai-Yue; Chen, Long-Hui |
| 國立成功大學 |
2001-09 |
A simulated annealing algorithm for facility layout problems under variable demand in Cellular Manufacturing Systems
|
Wang, Tai-Yue; Wu, Kuei-Bin; Liu, Y. W. |
| 國立成功大學 |
2001-08 |
The economic justification of machine changeover time reduction in a manufacturing cell
|
Wang, Tai-Yue; Song, Jun-Yi; Chen, Long-Hui |
| 國立成功大學 |
2001-06 |
A production lot size inventory model for deteriorating items with time-varying demand
|
Wang, Tai-Yue; Chen, Long-Hui |
| 國立成功大學 |
2000-06-15 |
Machine selection in flexible manufacturing cell: a fuzzy multiple attribute decision-making approach
|
Wang, Tai-Yue; Shaw, Chia-Fong; Chen, Yueh-Li |
| 國立成功大學 |
2000-04 |
A revised simulated annealing algorithm for obtaining the minimum total tardiness in job shop scheduling problems
|
Wang, Tai-Yue; Wu, Kuei-Bin |
| 國立成功大學 |
1999-05 |
An efficient configuration generation mechanism to solve job shop scheduling problems by the simulated annealing algorithm
|
Wu, Kuei-Bin; Wang, Tai-Yue |
| 國立成功大學 |
1998-04 |
An improved simulated annealing for facility layout problems in cellular manufacturing systems
|
Wang, Tai-Yue; Lin, Her-Chang; Wu, Kuei-Bin |
| 國立勤益科技大學 |
1997 |
External supply of skill groups: a case of industrial management in Taiwan
|
Kao, Chiang;Chen, Liang-Hsuan;Wang, Tai-Yue; Lee, Hong-Tau |
显示项目 21-30 / 30 (共2页) 1 2 > >> 每页显示[10|25|50]项目
|