|
English
|
正體中文
|
简体中文
|
总笔数 :0
|
|
造访人次 :
51826360
在线人数 :
310
教育部委托研究计画 计画执行:国立台湾大学图书馆
|
|
|
"wu hua yao"的相关文件
显示项目 1-8 / 8 (共1页) 1 每页显示[10|25|50]项目
| 朝陽科技大學 |
2022-01 |
Multiproduct manufacturer-retailer coordinated supply chain with adjustable rate for common parts, delayed differentiation, and multi-shipment
|
林宏達; Lin, Hong-Dar; Chiu, Victoria; Wu, Hua-Yao; Chiu, Yuan-Shyi Peter |
| 朝陽科技大學 |
2021-06 |
Multi-item Production Lot Sizing with Postponement, External Source for Common Parts, and Adjustable Rate for End Products
|
邱元錫; Chiu, Singa Wang; Wu, Hua-Yao; Chiu, Tiffany |
| 朝陽科技大學 |
2021-02-01 |
Studying the effect of stochastic breakdowns, overtime, and rework on inventory replenishment decision
|
Wu, Hua Yao; Wu, Cheng-Sian; 王聖嘉; 邱元錫 |
| 朝陽科技大學 |
2020-12-15 |
Incorporating Outsourcing Strategy and Quality Assurance into a Multiproduct Manufacturer–Retailer Coordination Replenishing Decision
|
邱元錫; Chiu, Victoria;Wu, Hua-Yao; Yeh, Tsu-Ming |
| 朝陽科技大學 |
2020-08-31 |
Optimal hybrid inventory replenishment runtime for a vendor- buyer coordinated system with breakdowns and rework/disposal of nonconforming items
|
王聖嘉; 宋鵬程; Wu, Hua-Yao |
| 朝陽科技大學 |
2020-02-29 |
Note on Cost Minimization for a Multi-product Fabrication-Distribution Problem with Commonality, Postponement and Quality Assurance
|
邱元錫; 林宏達; Wu, Hua-Yao |
| 朝陽科技大學 |
2020-01-17 |
A hybrid finite production rate system featuring random breakdown and rework
|
邱元錫; 王聖嘉; Chen, Hui-Cun; Wu, Hua-Yao |
| 國立臺灣大學 |
2005 |
質子交換膜燃料電池系統動態模擬及設計研究
|
吳樺曜; Wu, Hua-Yao |
显示项目 1-8 / 8 (共1页) 1 每页显示[10|25|50]项目
|