English  |  正體中文  |  简体中文  |  Total items :0  
Visitors :  51653138    Online Users :  932
Project Commissioned by the Ministry of Education
Project Executed by National Taiwan University Library
 
臺灣學術機構典藏系統 (Taiwan Academic Institutional Repository, TAIR)
About TAIR

Browse By

News

Copyright

Related Links

"wu muh cherng"

Return to Browse by Author
Sorting by Title Sort by Date

Showing items 106-130 of 146  (6 Page(s) Totally)
<< < 1 2 3 4 5 6 > >>
View [10|25|50] records per page

Institution Date Title Author
國立交通大學 2014-12-12T01:35:06Z DRAM封裝測試廠商競爭力分析架構 莊育荏; Chuang,Yu-Jen; 巫木誠; Wu, Muh-Cherng
國立交通大學 2014-12-12T01:35:04Z 台灣連鎖便利商店業競爭力分析─以 7-ELEVEN與全家為例 李玫樺; Lee, Mei-Hua; 巫木誠; Wu, Muh-Cherng
國立交通大學 2014-12-12T01:34:53Z 京都企業的經營模式分析 詹益仁; Chan, Yi-Jen; 巫木誠; Wu, Muh-Cherng
國立交通大學 2014-12-12T01:31:47Z 以組合派工法則求解雙流線型工廠排程 陳文旻; Chen, Wen-Min; 巫木誠; Wu, Muh-Cherng
國立交通大學 2014-12-12T01:31:47Z 考慮工件族整備時間之雙流線型工廠排程 林慈盈; Lin, Cih-Ying; 巫木誠; Wu, Muh-Cherng
國立交通大學 2014-12-12T01:31:43Z 應用基因演算法與家族式派工於傳輸整合步進機在小批量情境下之排程問題 呂佳玟; Lu, Chia-Wen; 巫木誠; Wu, Muh-Cherng
國立交通大學 2014-12-12T01:31:39Z 具等候時間限制之雙流線型工廠排程 林昭宏; Lin, Chao-Hung; 巫木誠; Wu, Muh-Cherng
國立交通大學 2014-12-12T01:31:36Z 中斷式幾何良率分配及交期限制下二階段生產系統投料決策之研究 黃亮銓; Huang, Liang-Chuan; 巫木誠; Wu, Muh-Cherng
國立交通大學 2014-12-12T01:26:18Z 以基因演算法求解雙流線型工廠排程 劉謹銘; Liu, Chin-Min; 巫木誠; Wu, Muh-Cherng
國立交通大學 2014-12-12T01:24:17Z 品質異常與對策之知識管理:以TFT-LCD製程為例 王祖晨; WANG, TZUU-CHERN; 巫木誠; Wu, Muh-Cherng
國立交通大學 2014-12-12T01:21:37Z 備份件供應鏈系統設計及營運之整合方法 徐楊康; Hsu, Yang-Kang; 巫木誠; Wu, Muh-Cherng
國立交通大學 2014-12-08T15:48:25Z The influence of organizational factors on safety in Taiwanese high-risk industries Hsu, Shang Hwa; Lee, Chun-Chia; Wu, Muh-Cherng; Takano, Kenichi
國立交通大學 2014-12-08T15:44:36Z Scheduling a hybrid MTO/MTS semiconductor fab with machine-dedication features Wu, Muh-Cherng; Jiang, Jr-Hsiung; Chang, Wen-Jen
國立交通大學 2014-12-08T15:36:09Z Scheduling of multiple in-line steppers for semiconductor wafer fabs Chiou, Chie-Wun; Wu, Muh-Cherng
國立交通大學 2014-12-08T15:33:31Z Effect of solution representations on Tabu search in scheduling applications Chen, Chen-Fu; Wu, Muh-Cherng; Lin, Keng-Han
國立交通大學 2014-12-08T15:29:42Z A comparison of two chromosome representation schemes used in solving a family-based scheduling problem Chen, Chen-Fu; Wu, Muh-Cherng; Li, Yi-Hsun; Tai, Pang-Hao; Chiou, Chie-Wun
國立交通大學 2014-12-08T15:29:33Z A combined dispatching criteria approach to scheduling dual flow-shops Chiou, Chie-Wun; Chen, Wen-Min; Wu, Muh-Cherng
國立交通大學 2014-12-08T15:28:24Z Pricing Capacity-Booking Fees for Semiconductor Fabs with Outsourcing Alternatives Wu, Muh-Cherng; Tsai, Cheng-Hang
國立交通大學 2014-12-08T15:20:55Z A genetic algorithm for scheduling dual flow shops Chiou, Chie-Wun; Chen, Wen-Min; Liu, Chin-Min; Wu, Muh-Cherng
國立交通大學 2014-12-08T15:20:11Z Exploring design features for enhancing players' challenge in strategy games Hsu, Shang Hwa; Wen, Ming-Hui; Wu, Muh-Cherng
國立交通大學 2014-12-08T15:20:11Z Factors influencing player preferences for heroic roles in role-playing games Hsu, Shang Hwa; Kao, Ching-Han; Wu, Muh-Cherng
國立交通大學 2014-12-08T15:20:09Z A cross-cultural study of organizational factors on safety: Japanese vs. Taiwanese oil refinery plants Hsu, Shang Hwa; Lee, Chun-Chia; Wu, Muh-Cherng; Takano, Kenichi
國立交通大學 2014-12-08T15:16:20Z Product-mix decision in a mixed-yield wafer fabrication scenario Wu, Muh-Cherng; Chang, Wen-Jung; Chiou, Chie-Wun
國立交通大學 2014-12-08T15:16:08Z A case-based reasoning approach to generating new product ideas Wu, Muh-Cherng; Lo, Ying-Fu; Hsu, Shang-Hwa
國立交通大學 2014-12-08T15:13:34Z A short-term capacity trading method for semiconductor fabs with partnership Wu, Muh-Cherng; Chang, Wen-Jen

Showing items 106-130 of 146  (6 Page(s) Totally)
<< < 1 2 3 4 5 6 > >>
View [10|25|50] records per page