|
English
|
正體中文
|
简体中文
|
總筆數 :0
|
|
造訪人次 :
52736574
線上人數 :
622
教育部委託研究計畫 計畫執行:國立臺灣大學圖書館
|
|
|
"yeh ruey huei"的相關文件
顯示項目 11-20 / 50 (共5頁) << < 1 2 3 4 5 > >> 每頁顯示[10|25|50]項目
| 亞洲大學 |
2008 |
Vendor selection by integrated fuzzy MCDM techniques with independent and interdependent relationships
|
Yang, Jiann Liang ; Chiu, Huan Neng ; Tzeng, Gwo-Hshiung ; Yeh, Ruey Huei |
| 亞洲大學 |
2008 |
Vendor Selection by Integrated Fuzzy MCDM Techniques with Independence and Interdependence Relationships
|
楊建樑;Yang, Jiann-Liang;邱煥能;Chiu, Huan-Neng;曾國雄;Tzeng, Gwo-Hshiung;葉瑞徽;Yeh, Ruey-Huei |
| 國立臺灣科技大學 |
2007 |
Optimal periodic replacement policy for repairable products under free repair warranty,
|
Yeh, Ruey-Huei; Chen, Ming-Yuh; Lin, Chen-Yi |
| 國立臺灣科技大學 |
2007 |
Fuzzy assessment of FMEA for a sewage plant
|
Yeh, Ruey-Huei; Hsieh, Mei-Huan |
| 國立臺灣科技大學 |
2007 |
Optimal Threshold Value of Failure-Rate for Leased Products with Preventive Maintenance Actions
|
Yeh, Ruey-Huei; Chang, WenLiang |
| 國立臺灣科技大學 |
2007 |
Two-phase maintenance policy for leased equipments with threshold values on age
|
Yeh, Ruey-Huei; Chang, WenLiang |
| 國立臺灣科技大學 |
2007 |
Optimal maintenance policy for leased facilities with a threshold value on failure-rate
|
Yeh, Ruey-Huei; Chang, WenLiang; Kao, Kow-Chin |
| 國立臺灣科技大學 |
2007 |
Periodic Preventive Maintenance Strategy for Equipment with Weibull Lifetime under Cooperation Contract
|
Lin, Yi-Fang; Yeh, Ruey-Huei; Kao, Kow-Chin |
| 國立臺灣科技大學 |
2007 |
Optimal preventive-maintenance policy for the age of leased equipment with some threshold values
|
Chang, WenLiang; Yeh, Ruey-Huei; Kao, Kow-Chin |
| 國立臺灣科技大學 |
2006 |
Optimal Lot-size and Inspection Policy for Products Sold with Warranty
|
Yeh, Ruey-Huei; Chen, Tzu-Hui |
顯示項目 11-20 / 50 (共5頁) << < 1 2 3 4 5 > >> 每頁顯示[10|25|50]項目
|