| 臺大學術典藏 |
1990 |
A Protocol for Integrating Voice and Data on FDDI/Ethernet Interconnected Networks
|
Yu, Chang-Sung; Lin, Swei-Ming; Yu, Chang-Sung; Lin, Swei-Ming |
| 國立臺灣大學 |
1989 |
全民健康保險制度下血液管理系統之研究
|
游張松; 蘇喜; Yu, Chang-Sung; Su, Hsi |
| 國立臺灣大學 |
1989 |
最大點集團之平行搜尋研究
|
游張松; Yu, Chang-Sung |
| 國立臺灣大學 |
1989 |
On Graphs with Polynomially Solvable Maximum-Weight Clique Problem
|
游張松; Balas, E.; Yu, Chang-Sung; Balas, E. |
| 國立臺灣大學 |
1988 |
A Min-Max Resource Allocation Problem with Substitutions
|
游張松; Pang, J. S.; Yu, Chang-Sung; Pang, J. S. |
| 國立臺灣大學 |
1987-07 |
An Enhanced Line Balancing Tool:LB+
|
游張松; Farber, M; Yu, Chang-Sung; Farber, M |
| 臺大學術典藏 |
1987-07 |
An Enhanced Line Balancing Tool:LB+
|
Farber, M; Yu, Chang-Sung; 游張松; Farber, M; Yu, Chang-Sung |
| 國立臺灣大學 |
1987 |
Assembly Line Design Tools: Line Balancing and Line Layout
|
游張松; Farber, M.; Luss, H.; Yu, Chang-Sung; Farber, M.; Luss, H. |
| 國立臺灣大學 |
1986-11 |
An Enhanced Version of the AIM Line Scheduler(ALIS) for the CIM-III Environment
|
游張松; Yu, Chang-Sung |
| 國立臺灣大學 |
1986-11 |
The Dynamic Distribution and Location Medel (DDLM):Formulation and Solution Technique
|
游張松; Yu, Chang-Sung |
| 國立臺灣大學 |
1986-11 |
A Linear Time Shortest Path Algorithm by Using a Systolic Priority Queue
|
游張松; Yu, Chang-Sung |
| 國立臺灣大學 |
1986-11 |
Production Line Design Tools:Analysis of Testing Equipment and Bufffer Space Requirements
|
游張松; Yu, Chang-Sung |
| 臺大學術典藏 |
1986-11 |
The Dynamic Distribution and Location Medel (DDLM):Formulation and Solution Technique
|
Yu, Chang-Sung; Yu, Chang-Sung |
| 臺大學術典藏 |
1986-11 |
Production Line Design Tools:Analysis of Testing Equipment and Bufffer Space Requirements
|
Yu, Chang-Sung; Yu, Chang-Sung |
| 臺大學術典藏 |
1986-11 |
A Linear Time Shortest Path Algorithm by Using a Systolic Priority Queue
|
Yu, Chang-Sung; Yu, Chang-Sung |
| 臺大學術典藏 |
1986-11 |
An Enhanced Version of the AIM Line Scheduler(ALIS) for the CIM-III Environment
|
Yu, Chang-Sung; Yu, Chang-Sung |
| 國立臺灣大學 |
1986-05 |
The AIM Line Scheduler(ALIS):a Shop Floor Loading Tool
|
游張松; Yu, Chang-Sung |
| 臺大學術典藏 |
1986-05 |
The AIM Line Scheduler(ALIS):a Shop Floor Loading Tool
|
Yu, Chang-Sung; Yu, Chang-Sung |
| 國立臺灣大學 |
1986 |
Book Review on Graph Theory by W. T. Tutte
|
游張松; Yu, Chang-Sung |
| 國立臺灣大學 |
1985-12 |
Scheduling the AIM Line at the North Carolina Works
|
游張松; Yu, Chang-Sung |
| 臺大學術典藏 |
1985-12 |
Scheduling the AIM Line at the North Carolina Works
|
Yu, Chang-Sung; Yu, Chang-Sung |
| 國立臺灣大學 |
1985-11 |
Assembly Line Design Tools: Line Balancing and Line Layout
|
游張松; Farber, M.; Luss, H.; Yu, Chang-Sung; Farber, M.; Luss, H. |
| 臺大學術典藏 |
1985-11 |
Assembly Line Design Tools: Line Balancing and Line Layout
|
Farber, M.; Luss, H.; Yu, Chang-Sung; Luss, H.; 游張松; Farber, M.; Luss, H.; Yu, Chang-Sung; Luss, H. |
| 國立臺灣大學 |
1985-07 |
Production Planning Issues:Learning Experiences and Internal Projects for the North Carolina Works
|
游張松; Yu, Chang-Sung |
| 臺大學術典藏 |
1985-07 |
Production Planning Issues:Learning Experiences and Internal Projects for the North Carolina Works
|
Yu, Chang-Sung; Yu, Chang-Sung |