English  |  正體中文  |  简体中文  |  總筆數 :0  
造訪人次 :  51890859    線上人數 :  908
教育部委託研究計畫      計畫執行:國立臺灣大學圖書館
 
臺灣學術機構典藏系統 (Taiwan Academic Institutional Repository, TAIR)
關於TAIR

瀏覽

消息

著作權

相關連結

"zhi jie chen"的相關文件

回到依作者瀏覽
依題名排序 依日期排序

顯示項目 1-15 / 15 (共1頁)
1 
每頁顯示[10|25|50]項目

機構 日期 題名 作者
元智大學 2012-04 Solving the Resource Constrained Project Scheduling Problem to Minimize the Financial Failure Risk Zhi-Jie Chen; Chiuh-Cheng Chyu
元智大學 2012 資源限制專案排程問題財務風險最小化之研究 陳芝傑; Zhi-Jie Chen
元智大學 2010-09 Parallel population Evolution Algorithm for the Time-Cost Trade-off Relation Project Scheduling Problem Chiuh-Cheng Chyu; Zhi-Jie Chen
元智大學 2010-06 A dual-population memetic algorithm for minimizing total cost of multi-mode resource-constrained project scheduling 徐旭昇; Zhi-Jie Chen
元智大學 2010-03 An evolutionary algorithm with multi-local search for the resource-constrained project scheduling problem 徐旭昇; Zhi-Jie Chen
元智大學 2009-12 A Memetic Algorithm for Minimizing the Total Cost of the Multi-Mode Resource-constrained Project Scheduling Problem Subject to a Deadline 徐旭昇; Zhi-Jie Chen
元智大學 2009-05 Scheduling jobs under constant period-by-period resource availability to maximize project profit at a due date 徐旭昇; Zhi-Jie Chen
元智大學 2008-10 Performance evaluation of various hybrid algorithms for the multi-mode resource constrained project scheduling problem with cost minimization objective 徐旭昇; Zhi-Jie Chen
元智大學 2007-12 A Branch And Bound Heuristic With Failures-Dependent Probability Jumping Rule For The Multi-Mode Resource Constrained Project Scheduling Problem 徐旭昇; Zhi-Jie Chen
元智大學 2007-10 Variable Neighborhood Search For A Payment Model In The Resource-Constrained Project Scheduling Problem With Simple Discount Rate 徐旭昇; Zhi-Jie Chen
元智大學 2007-10 Solving The Time/Cost Trade-Off Project Scheduling Problem With Renewable Resource Constraints And A Project Deadline 徐旭昇; Zhi-Jie Chen; Pong-Yang Lei
元智大學 2006-06 A two-phase method for the multi-mode resource-constrained project scheduling problem 徐旭昇; Angela H.L. Chen; Zhi-Jie Chen; Hsin-Hui Lin
元智大學 2005-12 A Mixed Strategy Genetic Local Search Algorithm for the Resource-Constrained Project Scheduling Problem 徐旭昇; H.L. Chen; Zhi-Jie Chen
元智大學 2005-07 Memetics Algorithms for the Project Scheduling Problem 徐旭昇; Angela H.L. Chen; Zhi-Jie Chen
元智大學 2005 應用瀰集進化演算法於多資源限制專案排程問題解算效果之分析 陳芝傑; Zhi-Jie Chen

顯示項目 1-15 / 15 (共1頁)
1 
每頁顯示[10|25|50]項目