| 國立交通大學 |
2014-12-08T15:15:41Z |
Precision measures for processes with multiple manufacturing lines
|
Pearn, W. L.; Chang, C. S. |
| 國立交通大學 |
2014-12-08T15:15:33Z |
Bayesian approach for measuring EEPROM process capability based on the one-sided indices C-PU and C-PL
|
Wu, Chien-Wei; Pearn, W. L. |
| 國立交通大學 |
2014-12-08T15:15:31Z |
One-sided process capability assessment in the presence of measurement errors
|
Pearn, W. L.; Liao, Mou-Yuan |
| 國立交通大學 |
2014-12-08T15:15:29Z |
Measuring production yield for processes with multiple quality characteristics
|
Pearn, W. L.; Wang, F. K.; Yen, C. H. |
| 國立交通大學 |
2014-12-08T15:15:20Z |
Measuring process performance based on expected loss with asymmetric tolerances
|
Pearn, W. L.; Chang, Y. C.; Wu, Chien-Wei |
| 國立交通大學 |
2014-12-08T15:15:10Z |
Accuracy analysis of the percentile method for estimating non normal manufacturing quality
|
Wu, Chien-Wei; Pearn, W. L.; Chang, C. S.; Chen, H. C. |
| 國立交通大學 |
2014-12-08T15:15:01Z |
On the sampling distributions of the estimated process loss indices with asymmetric tolerances
|
Chang, Y. C.; Pearn, W. L.; Wu, Chien-Wei |
| 國立交通大學 |
2014-12-08T15:15:01Z |
Multivariate capability indices: Distributional and inferential properties
|
Pearn, W. L.; Wang, F. K.; Yen, C. H. |
| 國立交通大學 |
2014-12-08T15:15:01Z |
Optimal management for a finite M/M/R queueing system with two arrival modes
|
Wang, Kuo-Hsiung; Ke, Jyh-Bin; Pearn, W. L. |
| 國立交通大學 |
2014-12-08T15:15:01Z |
A comparison of two methods for transforming non-normal manufacturing data
|
Chung, S. H.; Pearn, W. L.; Yang, Y. S. |
| 國立交通大學 |
2014-12-08T15:15:00Z |
Estimating process yield based on S-pk for multiple samples
|
Pearn, W. L.; Cheng, Ya Ching |
| 國立交通大學 |
2014-12-08T15:14:47Z |
An effective decision making method for product acceptance
|
Pearn, W. L.; Wu, Chien-Wei |
| 國立交通大學 |
2014-12-08T15:14:22Z |
Scheduling integrated circuit assembly operations on die bonder
|
Pearn, W. L.; Chung, S. H.; Lai, C. M. |
| 國立交通大學 |
2014-12-08T15:14:10Z |
Due-date assignment for wafer fabrication under demand variate environment
|
Pearn, W. L.; Chung, S. H.; Lai, C. A. |
| 國立交通大學 |
2014-12-08T15:13:35Z |
Measuring process capability based on Cpmk with gauge measurement errors
|
Hsu, B. M.; Shu, M. H.; Pearn, W. L. |
| 國立交通大學 |
2014-12-08T15:13:35Z |
Optimal tool replacement for processes with low fraction defective
|
Pearn, W. L.; Hsu, Ya-Chen |
| 國立交通大學 |
2014-12-08T15:13:32Z |
Tool replacement policy for one-sided processes with low fraction defective
|
Pearn, W. L.; Hsu, Y-C; Shiau, J-J Horng |
| 國立交通大學 |
2014-12-08T15:13:19Z |
Estimating and testing process precision with presence of gauge measurement errors
|
Pearn, W. L.; Liao, Mou-Yuan |
| 國立交通大學 |
2014-12-08T15:13:11Z |
Optimal control of an M/G/1/K queueing system with combined F policy and startup time
|
Wang, K.-H.; Kuo, C.-C.; Pearn, W. L. |
| 國立交通大學 |
2014-12-08T15:13:01Z |
Testing process precision for truncated normal distributions
|
Pearn, W. L.; Hung, H. N.; Peng, N. F.; Huang, C. Y. |
| 國立交通大學 |
2014-12-08T15:12:55Z |
Bootstrap approach for supplier selection based on production yield
|
Wu, C. -W.; Shu, M. H.; Pearn, W. L.; Liu, K. H. |
| 國立交通大學 |
2014-12-08T15:12:41Z |
A variables sampling plan based on C-pmk for product acceptance determination
|
Wu, Chien-Wei; Pearn, W. L. |
| 國立交通大學 |
2014-12-08T15:12:05Z |
Decision-making in a single-period inventory environment with fuzzy demand
|
Su, Rung-Hung; Yang, Dong-Yuh; Pearn, W. L. |
| 國立交通大學 |
2014-12-08T15:11:26Z |
A recursive method for the F-policy G/M/1/K queueing system with an exponential startup time
|
Wang, Kuo-Hsiung; Kuo, Ching-Chang; Pearn, W. L. |
| 國立交通大學 |
2014-12-08T15:10:35Z |
Capability adjustment or gamma processes with mean shift consideration in implementing Six Sigma program
|
Hsu, Ya-Chen; Pearn, W. L.; Wu, Pei-Ching |