|
English
|
正體中文
|
简体中文
|
总笔数 :2831377
|
|
造访人次 :
33285944
在线人数 :
684
教育部委托研究计画 计画执行:国立台湾大学图书馆
|
|
|
"tran d h"的相关文件
显示项目 11-17 / 17 (共1页) 1 每页显示[10|25|50]项目
國立臺灣科技大學 |
2016 |
Solving resource-constrained project scheduling problems using hybrid artificial bee colony with differential evolution
|
Tran, D.-H;Cheng, M.-Y;Cao, M.-T. |
國立臺灣科技大學 |
2016 |
Using Fuzzy Clustering Chaotic-based Differential Evolution to solve multiple resources leveling in the multiple projects scheduling prob lem
|
Tran, D.-H;Cheng, M.-Y;Pham, A.-D. |
國立臺灣科技大學 |
2015 |
Hybrid multiple objective artificial bee colony with differential evolution for the time-cost-quality tradeoff problem
|
Tran, D.-H.;Cheng, M.-Y.;Cao, M.-T. |
國立臺灣科技大學 |
2015 |
Opposition-Based Multiple-Objective Differential Evolution to Solve the Time-Cost-Environment Impact Trade-Off Problem in Construction Projects
|
Cheng, M.-Y.;Tran, D.-H. |
國立臺灣科技大學 |
2014 |
Two-phase differential evolution for the multiobjective optimization of time-cost tradeoffs in resource-constrained construction projects
|
Cheng, M.-Y.;Tran, D.-H. |
國立臺灣科技大學 |
2014 |
A hybrid fuzzy inference model based on RBFNN and artificial bee colony for predicting the uplift capacity of suction caissons
|
Cheng, M.-Y.;Cao, M.-T.;Tran, D.-H. |
國立臺灣科技大學 |
2014 |
Using a fuzzy clustering chaotic-based differential evolution with serial method to solve resource-constrained project scheduling problems
|
Cheng, M.-Y.;Tran, D.-H.;Wu, Y.-W. |
显示项目 11-17 / 17 (共1页) 1 每页显示[10|25|50]项目
|