|
English
|
正體中文
|
简体中文
|
總筆數 :2831598
|
|
造訪人次 :
33303587
線上人數 :
761
教育部委託研究計畫 計畫執行:國立臺灣大學圖書館
|
|
|
"tran d h"的相關文件
顯示項目 11-17 / 17 (共1頁) 1 每頁顯示[10|25|50]項目
國立臺灣科技大學 |
2016 |
Solving resource-constrained project scheduling problems using hybrid artificial bee colony with differential evolution
|
Tran, D.-H;Cheng, M.-Y;Cao, M.-T. |
國立臺灣科技大學 |
2016 |
Using Fuzzy Clustering Chaotic-based Differential Evolution to solve multiple resources leveling in the multiple projects scheduling prob lem
|
Tran, D.-H;Cheng, M.-Y;Pham, A.-D. |
國立臺灣科技大學 |
2015 |
Hybrid multiple objective artificial bee colony with differential evolution for the time-cost-quality tradeoff problem
|
Tran, D.-H.;Cheng, M.-Y.;Cao, M.-T. |
國立臺灣科技大學 |
2015 |
Opposition-Based Multiple-Objective Differential Evolution to Solve the Time-Cost-Environment Impact Trade-Off Problem in Construction Projects
|
Cheng, M.-Y.;Tran, D.-H. |
國立臺灣科技大學 |
2014 |
Two-phase differential evolution for the multiobjective optimization of time-cost tradeoffs in resource-constrained construction projects
|
Cheng, M.-Y.;Tran, D.-H. |
國立臺灣科技大學 |
2014 |
A hybrid fuzzy inference model based on RBFNN and artificial bee colony for predicting the uplift capacity of suction caissons
|
Cheng, M.-Y.;Cao, M.-T.;Tran, D.-H. |
國立臺灣科技大學 |
2014 |
Using a fuzzy clustering chaotic-based differential evolution with serial method to solve resource-constrained project scheduling problems
|
Cheng, M.-Y.;Tran, D.-H.;Wu, Y.-W. |
顯示項目 11-17 / 17 (共1頁) 1 每頁顯示[10|25|50]項目
|