English  |  正體中文  |  简体中文  |  Total items :0  
Visitors :  51888138    Online Users :  907
Project Commissioned by the Ministry of Education
Project Executed by National Taiwan University Library
 
臺灣學術機構典藏系統 (Taiwan Academic Institutional Repository, TAIR)
About TAIR

Browse By

News

Copyright

Related Links

"zhi jie chen"

Return to Browse by Author
Sorting by Title Sort by Date

Showing items 1-15 of 15  (1 Page(s) Totally)
1 
View [10|25|50] records per page

Institution Date Title Author
元智大學 2012-04 Solving the Resource Constrained Project Scheduling Problem to Minimize the Financial Failure Risk Zhi-Jie Chen; Chiuh-Cheng Chyu
元智大學 2012 資源限制專案排程問題財務風險最小化之研究 陳芝傑; Zhi-Jie Chen
元智大學 2010-09 Parallel population Evolution Algorithm for the Time-Cost Trade-off Relation Project Scheduling Problem Chiuh-Cheng Chyu; Zhi-Jie Chen
元智大學 2010-06 A dual-population memetic algorithm for minimizing total cost of multi-mode resource-constrained project scheduling 徐旭昇; Zhi-Jie Chen
元智大學 2010-03 An evolutionary algorithm with multi-local search for the resource-constrained project scheduling problem 徐旭昇; Zhi-Jie Chen
元智大學 2009-12 A Memetic Algorithm for Minimizing the Total Cost of the Multi-Mode Resource-constrained Project Scheduling Problem Subject to a Deadline 徐旭昇; Zhi-Jie Chen
元智大學 2009-05 Scheduling jobs under constant period-by-period resource availability to maximize project profit at a due date 徐旭昇; Zhi-Jie Chen
元智大學 2008-10 Performance evaluation of various hybrid algorithms for the multi-mode resource constrained project scheduling problem with cost minimization objective 徐旭昇; Zhi-Jie Chen
元智大學 2007-12 A Branch And Bound Heuristic With Failures-Dependent Probability Jumping Rule For The Multi-Mode Resource Constrained Project Scheduling Problem 徐旭昇; Zhi-Jie Chen
元智大學 2007-10 Variable Neighborhood Search For A Payment Model In The Resource-Constrained Project Scheduling Problem With Simple Discount Rate 徐旭昇; Zhi-Jie Chen
元智大學 2007-10 Solving The Time/Cost Trade-Off Project Scheduling Problem With Renewable Resource Constraints And A Project Deadline 徐旭昇; Zhi-Jie Chen; Pong-Yang Lei
元智大學 2006-06 A two-phase method for the multi-mode resource-constrained project scheduling problem 徐旭昇; Angela H.L. Chen; Zhi-Jie Chen; Hsin-Hui Lin
元智大學 2005-12 A Mixed Strategy Genetic Local Search Algorithm for the Resource-Constrained Project Scheduling Problem 徐旭昇; H.L. Chen; Zhi-Jie Chen
元智大學 2005-07 Memetics Algorithms for the Project Scheduling Problem 徐旭昇; Angela H.L. Chen; Zhi-Jie Chen
元智大學 2005 應用瀰集進化演算法於多資源限制專案排程問題解算效果之分析 陳芝傑; Zhi-Jie Chen

Showing items 1-15 of 15  (1 Page(s) Totally)
1 
View [10|25|50] records per page