|
English
|
正體中文
|
简体中文
|
Total items :0
|
|
Visitors :
50610268
Online Users :
1253
Project Commissioned by the Ministry of Education Project Executed by National Taiwan University Library
|
|
|
|
Taiwan Academic Institutional Repository >
Browse by Title
|
Showing items 351976-352000 of 2347237 (93890 Page(s) Totally) << < 14075 14076 14077 14078 14079 14080 14081 14082 14083 14084 > >> View [10|25|50] records per page
| 中國文化大學 |
2008 |
Economic interdependence and third-party international interactions: A 30-country third-party bloc case study
|
Chang, Yuan-Ching |
| 國立交通大學 |
2014-12-08T15:02:57Z |
ECONOMIC INVESTIGATION OF PEER PRODUCED SERVICES
|
Li, Yung-Ming; Lee, Yi-Lin |
| 國立臺灣大學 |
1988-02 |
Economic Issue of Farm Land Preservation
|
陳明健; Chen, Ming-Chien |
| 中原大學 |
2005-12 |
Economic kanban quantity and withdrawal lot size using optimal and meta-heuristic methods
|
Widyadana G.A.;Wee H. M.; |
| 國立成功大學 |
2016-04-03 |
Economic lot sizing in a production system with random demand
|
Lee, Shine-Der; Yang, Chin-Ming; Lan, Shu-Chuan |
| 朝陽科技大學 |
2021-03 |
ECONOMIC MANUFACTURING QUANTITY MODEL WITH MACHINE FAILURE, OVERTIME, AND REWORK/DISPOSAL OF NONCONFORMING ITEMS
|
邱元錫; 王聖嘉; Chiu, Tiffany; Lin, Hong-Dar |
| 南台科技大學 |
2007-11 |
Economic Manufacturing Quantity, Optimum Process Mean, and Economic Specification Limits Setting under the Rectifying Inspection Plan
|
Chung-Ho Chen; Min-Tsai Lai; 賴明才 |
| 南台科技大學 |
2007-11 |
Economic manufacturing quantity, optimum process mean, and economic specification limits setting under the rectifying inspection plan
|
陳忠和; Chung-Ho Chen; Min-Tsai Lai |
| 嘉南藥理大學 |
2009 |
Economic Modelling
|
Elsevier SDOL |
| 國立政治大學 |
2002 |
Economic Models of Innovations:Why GP Can Be a Possible Way Out?
|
陳樹衡 |
| 義守大學 |
2011-10 |
Economic optimization for an off-line inspection, disposition and rework model
|
W. C. Tsai;Chih-Hsiung Wang |
| 國立臺灣科技大學 |
2009 |
Economic optimization of off-line inspection with rework consideration
|
Wang W.-Y.; Sheu S.-H.; Chen Y.-C.; Horng D.-J. |
| 元智大學 |
2010-05 |
Economic optimization of resource-constrained project scheduling: A two-phase metaheuristic approach
|
徐旭昇; Angela H.L. Chen |
| 南亞技術學院 |
2010-06 |
Economic optimization of resource-constrained project scheduling: a two-phase metaheuristic approach
|
Chen, Angela H. L.;Chyu, Chiuh-Cheng |
| 國立高雄第一科技大學 |
2011.07 |
Economic order quality model with immediate return for defective items
|
Hsu, Wen-Kai K.;Yu, H.-F. |
| 淡江大學 |
2002-09-01 |
Economic order quantity and optimal payment time under supplier credit
|
Chang, Chun-tao; Wu, Shuo-jye |
| 國立東華大學 |
2005-07 |
Economic Order Quantity for a Multiple-Product System with Joint Order and Restricted Capacity
|
Hwang, Juh-Wen; 黃郁文 |
| 中原大學 |
2009 |
Economic order quantity model in reverse logistics that considers lead time, stochastic demand and returned quantity
|
Chiu, Yufang;Meng-Yen Li;Shi-Jyun Wang; |
| 淡江大學 |
2002-03-01 |
Economic order quantity model under cash discount and payment delay
|
歐陽良裕; Ouyang, Liang-yuh; Chen, Miao-sheng; Chuang, Kai-wayne |
| 南華大學 |
2002-03 |
Economic order quantity model under cash discount and payment delay
|
陳淼勝;Chen, Miao-Sheng |
| 國立臺灣科技大學 |
2014 |
Economic order quantity under advance payment
|
Zhang, Q.;Tsao, Y.-C.;Chen, T.-H. |
| 國立勤益科技大學 |
2007 |
Economic order quantity under conditionally permissible delay in payments
|
Huang, Yung-Fu |
| 朝陽科技大學 |
2007 |
Economic order quantity under conditionally permissible delay in payments
|
黃勇富; Yung-Fu Huang |
| 淡江大學 |
2008-04 |
Economic order quantity under conditions of a one-time-only extended permissible delay period in payments
|
Goyal, Suresh Kumar; 張春桃; Chang, Chun-tao |
| 朝陽科技大學 |
2008-12 |
Economic order quantity under retailer partial trade credit in two-echelon supply chain
|
黃勇富; 凃鈺城; 黃宏富; 王言 |
Showing items 351976-352000 of 2347237 (93890 Page(s) Totally) << < 14075 14076 14077 14078 14079 14080 14081 14082 14083 14084 > >> View [10|25|50] records per page
|