English  |  正體中文  |  简体中文  |  Total items :0  
Visitors :  50598119    Online Users :  1653
Project Commissioned by the Ministry of Education
Project Executed by National Taiwan University Library
 
臺灣學術機構典藏系統 (Taiwan Academic Institutional Repository, TAIR)
About TAIR

Browse By

News

Copyright

Related Links

Jump to: [ Chinese Items ] [ 0-9 ] [ A B C D E F G H I J K L M N O P Q R S T U V W X Y Z ]
or enter the first few letters:   

Showing items 742976-743000 of 2347236  (93890 Page(s) Totally)
<< < 29715 29716 29717 29718 29719 29720 29721 29722 29723 29724 > >>
View [10|25|50] records per page

Institution Date Title Author
國立臺灣科技大學 2004 Scheduling system with focus on practical concerns in repetitive projects Yang, I-Tung
淡江大學 2004-07 Scheduling system with focus on practical concerns in repetitive projects 楊亦東; Yang, I-tung; Ioannou, Photios G.
臺大學術典藏 2018-09-10T03:47:49Z Scheduling tasks with variable deadlines Shih, C.-S.; Sha, L.; Liu, J.; CHI-SHENG SHIH
臺大學術典藏 2020-05-04T07:44:36Z Scheduling Tasks With Variable Deadlines. Sha, Lui; Liu, Jane W.-S.; CHI-SHENG SHIH; Shih, Chi-Sheng
臺大學術典藏 1985-12 Scheduling the AIM Line at the North Carolina Works Yu, Chang-Sung; Yu, Chang-Sung
國立臺灣大學 1985-12 Scheduling the AIM Line at the North Carolina Works 游張松; Yu, Chang-Sung
國立中山大學 1997 Scheduling the partially parallel loops at run-time Tze-Nan Sheng;Po-Hsueh Hsu;T.C. Huang
國立交通大學 2014-12-08T15:07:15Z Scheduling time-dependent jobs under mixed deterioration Gawiejnowicz, Stanislaw; Lin, Bertrand M. T.
朝陽科技大學 2004 Scheduling two-component products on parallel machines 楊文華
朝陽科技大學 2005 Scheduling Two-Machine No-Wait Open Shops to Minimize Makespan 廖經芳; Ching-Fang Liaw
朝陽科技大學 2004 Scheduling Two-Machine Preemptive Open Shops to Minimize Total Completion Time 廖經芳; Ching-Fang Liaw
國立成功大學 2012-12 Scheduling two-stage hybrid flow shops with parallel batch, release time, and machine eligibility constraints Wang, I. -Lin; Yang, Taho; Chang, Yu-Bang
國立臺灣科技大學 2004 Scheduling under machine breakdown in a continuous industry Liao, C. J. ; Chen, W. J.
國立政治大學 1990 Scheduling unit processing time jobs on a single machine with multiple criteria 陳春龍; Chen, Chuen-lung;Bulfin, Robert L.
國立成功大學 2013-09 Scheduling unrelated parallel machines in semiconductor manufacturing by problem reduction and local search heuristics Wang, I-Lin; Wang, Yi-Chi; Chen, Chih-Wei
朝陽科技大學 2003 Scheduling Unrelated Parallel Machines to Minimize Total Weighted Tardiness 廖經芳;陳銘芷;林晹桂; Ching-Fang Liaw;Yang-Kuei Lin;Chun-Yuan Cheng;Mingchih Chen
國立勤益科技大學 2012-07 Scheduling unrelated parallel machines with setup consideration applying GA and response surface method 王文派
元智大學 2007-04 Scheduling via Agent Negotiation: A Fuzzy Constraint-based Approach 賴國華; Meng-Wen Lin; Bo-Rue Kao
國立交通大學 2014-12-08T15:37:34Z Scheduling with Centralized and Decentralized Batching Policies in Concurrent Open Shops Lin, B. M. T.; Cheng, T. C. E.
國立臺灣科技大學 2004 Scheduling with Different maintenance Polices in a textile company Chen, W. J. ; Liao, C. J.
國立臺灣科技大學 2016 Scheduling with multi-attribute set-up times on unrelated parallel machines Liao, C.-J;Lee, C.-H;Tsai, H.-T.
國立臺灣科技大學 2012 Scheduling with multi-attribute setup times Lee, C.-H.;Liao, C.-J.;Chao, C.-W.
國立臺灣科技大學 2012 Scheduling with multi-attribute setup times Lee, C.-H.;Liao, C.-J.;Chao, C.-W.
國立臺灣科技大學 2014 Scheduling with multi-attribute setup times on two identical parallel machines Lee, C.-H.;Liao, C.-J.;Chung, T.-P.
國立成功大學 2024 Scheduling with Obligatory Tests Dogeas;K;Erlebach;T;Liang;Y, -C.

Showing items 742976-743000 of 2347236  (93890 Page(s) Totally)
<< < 29715 29716 29717 29718 29719 29720 29721 29722 29723 29724 > >>
View [10|25|50] records per page