| 臺大學術典藏 |
2020-05-04T08:07:12Z |
Scheduling of Query Execution Plans in Symmetric Multiprocessor Database Systems.
|
Wu, Jun; Chen, Jian-Jia; Hsueh, Chih-wen; Kuo, Tei-Wei; TEI-WEI KUO |
| 國立交通大學 |
2014-12-08T15:33:49Z |
Scheduling of transportation fleet maintenance service by an improved Lipschitz optimization algorithm
|
Yao, Ming-Jong; Huang, Jia-Yen |
| 臺大學術典藏 |
2020-05-04T08:02:28Z |
Scheduling of variable-time jobs for distributed systems with heterogeneous processor cardinality
|
Wu, J.-J.; Chang, H.-J.; Ho, Y.-F.; Liu, P.; PANGFENG LIU |
| 國立臺灣科技大學 |
2010 |
Scheduling on identical machines with batch arrivals
|
Chung T.-P.; Liao C.-J.; Su L.-H. |
| 國立臺灣科技大學 |
2008 |
Scheduling on identical machines with batch arrivals in semiconductor testing house
|
Chung T.P.; Liao C.J.; Su L.H. |
| 中原大學 |
2009 |
Scheduling on identical parallel machines to minimize total completion time with deadline and machine eligibility constraints
|
Ling-Huey Su |
| 國立交通大學 |
2017-04-21T06:55:56Z |
Scheduling online mixed-parallel workflows of rigid tasks in heterogeneous multi-cluster environments
|
Wang, Yi-Rong; Huang, Kuo-Chan; Wang, Feng-Jian |
| 南台科技大學 |
2000 |
Scheduling Outpatient Appointment with Walk-in
|
F. Huarng;H. Hou ; J. Lee |
| 中原大學 |
2009 |
Scheduling parallel machines with resource-dependent processing times
|
Ling-Huey Su; Chun-Yuan Lien |
| 國立臺灣大學 |
1994-05 |
Scheduling parallel tasks on hypercubes
|
Lin, J.-F.; Chen, S.-J. |
| 臺大學術典藏 |
2018-09-10T04:53:33Z |
Scheduling parallel tasks on hypercubes
|
Lin, J.-F.;Chen, S.-J.; Lin, J.-F.; Chen, S.-J.; SAO-JIE CHEN |
| 臺大學術典藏 |
1994 |
Scheduling Parallel Tasks With Setup Time on Hypercube Systems
|
Lin, J. F.; See, W. B.; Chen, Sao-Jie; Lin, J. F.; See, W. B.; 陳少傑; Chen, Sao-Jie |
| 國立臺灣大學 |
1994 |
Scheduling Parallel Tasks With Setup Time on Hypercube Systems
|
Lin, J. F.; See, W. B.; 陳少傑; Lin, J. F.; See, W. B.; Chen, Sao-Jie |
| 朝陽科技大學 |
2014-06-03 |
Scheduling Patients in Hospitals based on Multi-agent Systems
|
Hsieh, Fu-Shiung;Lin, Jim-Bon; 謝富雄 |
| 國立成功大學 |
2012-09-05 |
Scheduling performance enhancement by network coding in wireless mesh networks
|
Li, J. -S.; Liu, K. -H.; Chilamkurti, N.; Shu, L.; Duong, T. Q. |
| 國立勤益科技大學 |
2007 |
Scheduling Performance Evaluation in Hybrid Production Environments
|
Wang, W.P. |
| 國立成功大學 |
2012-09 |
Scheduling Periodic Continuous Queries in Real-Time Data Broadcast Environments
|
Wang, Hongya; Xiao, Yingyuan; Shu, LihChyun |
| 國立交通大學 |
2014-12-08T15:05:51Z |
SCHEDULING PRECEDENCE GRAPHS IN SYSTEMS WITH INTERPROCESSOR COMMUNICATION TIMES
|
HWANG, JJ; CHOW, YC; ANGER, FD; LEE, CY |
| 朝陽科技大學 |
2005 |
Scheduling Preemptive Open Shops to Minimize Total Tardiness
|
廖經芳; Ching-Fang Liaw |
| 國立臺灣科技大學 |
2008 |
Scheduling Project Tasks under Resource Constrained using Design Structure Matrix and Quality Equations
|
陳戴幸 |
| 臺大學術典藏 |
2018-09-10T04:32:50Z |
Scheduling real-time dwells using tasks with synthetic periods
|
Shih, C.-S.; Gopalakrishnan, S.; Ganti, P.; Caccamo, M.; Sha, L.; CHI-SHENG SHIH |
| 臺大學術典藏 |
2020-05-04T07:44:35Z |
Scheduling Real-Time Dwells Using Tasks with Synthetic Periods.
|
Shih, Chi-Sheng; Gopalakrishnan, Sathish; Ganti, Phanindra; Caccamo, Marco; Sha, Lui; CHI-SHENG SHIH |
| 國立臺灣科技大學 |
2006 |
Scheduling real-time multi-processor systems with distance-constrained tasks using the early-release-fair model
|
Chen, D.-R.;Hsu, C.-C.;Wang, C.-M. |
| 臺大學術典藏 |
2001-01 |
Scheduling Real-Time Systems with End-to-End Timing Constraints Using the Distributed Pinwheel Model
|
Hsueh, Chih-Wen; Lin, Kwei-Jay; Hsueh, Chih-wen; Lin, Kwei-Jay |
| 臺大學術典藏 |
2020-05-04T07:48:20Z |
Scheduling real-time systems with end-to-end timing constraints using the distributed pinwheel model
|
Hsueh, C.-W.; Lin, K.-J.; CHIH-WEN HSUEH |