| 國立交通大學 |
2014-12-08T15:36:09Z |
Scheduling of multiple in-line steppers for semiconductor wafer fabs
|
Chiou, Chie-Wun; Wu, Muh-Cherng |
| 臺大學術典藏 |
2018-09-10T15:34:07Z |
Scheduling of optimal DASH streaming
|
Liu, Y.-C.; Chung, W.-C.; Lee, M.-H.; Wang, K.-J.; Chang, S.-H.; Wu, C.-J.; Chang, R.-I.; Ho, J.-M.; RAY-I CHANG |
| 建國科技大學 |
2010 |
Scheduling of parallel machines with job delivery coordination
|
許勝源 |
| 亞洲大學 |
1995 |
Scheduling of precedence contrained tasks on multiprocessor systems
|
Chih Yeh;Shian shyong Tseng;Chao-Tung Yang |
| 國立臺灣大學 |
2005 |
Scheduling of Query Execution Plans in Distributed-Memory Multiprocessor Database Systems
|
Wu, Jun; Chen, Jian-Jia; Hsueh, Chih-Wen; Kuo, Tei-Wei |
| 臺大學術典藏 |
2004 |
Scheduling of Query Execution Plans in Symmetric Multiprocessor Database Systems
|
Wu, Jun; Chen, Jian-Jia; Hsueh, Chih-Wen; Kuo, Tei-Wei; Wu, Jun; Chen, Jian-Jia; Hsueh, Chih-wen; Kuo, Tei-Wei |
| 國立臺灣大學 |
2004 |
Scheduling of Query Execution Plans in Symmetric Multiprocessor Database Systems
|
Wu, Jun; Chen, Jian-Jia; Hsueh, Chih-wen; Kuo, Tei-Wei |
| 臺大學術典藏 |
2020-05-04T08:07:12Z |
Scheduling of Query Execution Plans in Symmetric Multiprocessor Database Systems.
|
Wu, Jun; Chen, Jian-Jia; Hsueh, Chih-wen; Kuo, Tei-Wei; TEI-WEI KUO |
| 國立交通大學 |
2014-12-08T15:33:49Z |
Scheduling of transportation fleet maintenance service by an improved Lipschitz optimization algorithm
|
Yao, Ming-Jong; Huang, Jia-Yen |
| 臺大學術典藏 |
2020-05-04T08:02:28Z |
Scheduling of variable-time jobs for distributed systems with heterogeneous processor cardinality
|
Wu, J.-J.; Chang, H.-J.; Ho, Y.-F.; Liu, P.; PANGFENG LIU |
| 國立臺灣科技大學 |
2010 |
Scheduling on identical machines with batch arrivals
|
Chung T.-P.; Liao C.-J.; Su L.-H. |
| 國立臺灣科技大學 |
2008 |
Scheduling on identical machines with batch arrivals in semiconductor testing house
|
Chung T.P.; Liao C.J.; Su L.H. |
| 中原大學 |
2009 |
Scheduling on identical parallel machines to minimize total completion time with deadline and machine eligibility constraints
|
Ling-Huey Su |
| 國立交通大學 |
2017-04-21T06:55:56Z |
Scheduling online mixed-parallel workflows of rigid tasks in heterogeneous multi-cluster environments
|
Wang, Yi-Rong; Huang, Kuo-Chan; Wang, Feng-Jian |
| 南台科技大學 |
2000 |
Scheduling Outpatient Appointment with Walk-in
|
F. Huarng;H. Hou ; J. Lee |
| 中原大學 |
2009 |
Scheduling parallel machines with resource-dependent processing times
|
Ling-Huey Su; Chun-Yuan Lien |
| 國立臺灣大學 |
1994-05 |
Scheduling parallel tasks on hypercubes
|
Lin, J.-F.; Chen, S.-J. |
| 臺大學術典藏 |
2018-09-10T04:53:33Z |
Scheduling parallel tasks on hypercubes
|
Lin, J.-F.;Chen, S.-J.; Lin, J.-F.; Chen, S.-J.; SAO-JIE CHEN |
| 臺大學術典藏 |
1994 |
Scheduling Parallel Tasks With Setup Time on Hypercube Systems
|
Lin, J. F.; See, W. B.; Chen, Sao-Jie; Lin, J. F.; See, W. B.; 陳少傑; Chen, Sao-Jie |
| 國立臺灣大學 |
1994 |
Scheduling Parallel Tasks With Setup Time on Hypercube Systems
|
Lin, J. F.; See, W. B.; 陳少傑; Lin, J. F.; See, W. B.; Chen, Sao-Jie |
| 朝陽科技大學 |
2014-06-03 |
Scheduling Patients in Hospitals based on Multi-agent Systems
|
Hsieh, Fu-Shiung;Lin, Jim-Bon; 謝富雄 |
| 國立成功大學 |
2012-09-05 |
Scheduling performance enhancement by network coding in wireless mesh networks
|
Li, J. -S.; Liu, K. -H.; Chilamkurti, N.; Shu, L.; Duong, T. Q. |
| 國立勤益科技大學 |
2007 |
Scheduling Performance Evaluation in Hybrid Production Environments
|
Wang, W.P. |
| 國立成功大學 |
2012-09 |
Scheduling Periodic Continuous Queries in Real-Time Data Broadcast Environments
|
Wang, Hongya; Xiao, Yingyuan; Shu, LihChyun |
| 國立交通大學 |
2014-12-08T15:05:51Z |
SCHEDULING PRECEDENCE GRAPHS IN SYSTEMS WITH INTERPROCESSOR COMMUNICATION TIMES
|
HWANG, JJ; CHOW, YC; ANGER, FD; LEE, CY |
| 朝陽科技大學 |
2005 |
Scheduling Preemptive Open Shops to Minimize Total Tardiness
|
廖經芳; Ching-Fang Liaw |
| 國立臺灣科技大學 |
2008 |
Scheduling Project Tasks under Resource Constrained using Design Structure Matrix and Quality Equations
|
陳戴幸 |
| 臺大學術典藏 |
2018-09-10T04:32:50Z |
Scheduling real-time dwells using tasks with synthetic periods
|
Shih, C.-S.; Gopalakrishnan, S.; Ganti, P.; Caccamo, M.; Sha, L.; CHI-SHENG SHIH |
| 臺大學術典藏 |
2020-05-04T07:44:35Z |
Scheduling Real-Time Dwells Using Tasks with Synthetic Periods.
|
Shih, Chi-Sheng; Gopalakrishnan, Sathish; Ganti, Phanindra; Caccamo, Marco; Sha, Lui; CHI-SHENG SHIH |
| 國立臺灣科技大學 |
2006 |
Scheduling real-time multi-processor systems with distance-constrained tasks using the early-release-fair model
|
Chen, D.-R.;Hsu, C.-C.;Wang, C.-M. |
| 臺大學術典藏 |
2001-01 |
Scheduling Real-Time Systems with End-to-End Timing Constraints Using the Distributed Pinwheel Model
|
Hsueh, Chih-Wen; Lin, Kwei-Jay; Hsueh, Chih-wen; Lin, Kwei-Jay |
| 國立臺灣大學 |
2001-01 |
Scheduling Real-Time Systems with End-to-End Timing Constraints Using the Distributed Pinwheel Model
|
Hsueh, Chih-wen; Lin, Kwei-Jay |
| 臺大學術典藏 |
2020-05-04T07:48:20Z |
Scheduling real-time systems with end-to-end timing constraints using the distributed pinwheel model
|
Hsueh, C.-W.; Lin, K.-J.; CHIH-WEN HSUEH |
| 國立交通大學 |
2014-12-08T15:08:00Z |
Scheduling semiconductor in-line steppers in new product/process introduction scenarios
|
Wu, Muh-Cherng; Chiou, Chie-Wun |
| 臺大學術典藏 |
2018-09-10T03:48:04Z |
Scheduling semiconductor wafer fabrication by using ordinal optimization-based simulation
|
Hsieh, B.-W.; Chen, C.-H.; Chang, S.-C.; SHI-CHUNG CHANG |
| 中原大學 |
1996-07 |
Scheduling Short-Term Hydrothermal Generation Using Evolutionary Programming Techniques
|
P.C. Yang;H.T. Yang;C.L. Huang |
| 國立交通大學 |
2020-07-01T05:22:10Z |
Scheduling step-deteriorating jobs to minimize the total completion time
|
Cheng, T. C. E.; Kravchenko, Svetlana A.; Lin, Bertrand M. T. |
| 朝陽科技大學 |
2007 |
Scheduling strategy for realistic implementation of video on demand over IPTV system
|
張林煌; 廖明沂; 廖俊鑑; L.-H. Chang; M.-Y Liao; J.-J. Liaw |
| 育達商業科技大學 |
2005 |
Scheduling Support System for the Coordinated Scheduling of Production and Delivery
|
Jason Chao-Hsien Pan;Zhi-Lun Wu;Ming-Feng Yang |
| 朝陽科技大學 |
2015-11 |
Scheduling Sustainable Supply Chains based on Multi-agent Systems and Workflow Models
|
HSIEH, FU-SHIUNG |
| 國立臺灣科技大學 |
2004 |
Scheduling system with focus on practical concerns in repetitive projects
|
Yang, I-Tung |
| 淡江大學 |
2004-07 |
Scheduling system with focus on practical concerns in repetitive projects
|
楊亦東; Yang, I-tung; Ioannou, Photios G. |
| 臺大學術典藏 |
2018-09-10T03:47:49Z |
Scheduling tasks with variable deadlines
|
Shih, C.-S.; Sha, L.; Liu, J.; CHI-SHENG SHIH |
| 臺大學術典藏 |
2020-05-04T07:44:36Z |
Scheduling Tasks With Variable Deadlines.
|
Sha, Lui; Liu, Jane W.-S.; CHI-SHENG SHIH; Shih, Chi-Sheng |
| 臺大學術典藏 |
1985-12 |
Scheduling the AIM Line at the North Carolina Works
|
Yu, Chang-Sung; Yu, Chang-Sung |
| 國立臺灣大學 |
1985-12 |
Scheduling the AIM Line at the North Carolina Works
|
游張松; Yu, Chang-Sung |
| 國立中山大學 |
1997 |
Scheduling the partially parallel loops at run-time
|
Tze-Nan Sheng;Po-Hsueh Hsu;T.C. Huang |
| 國立交通大學 |
2014-12-08T15:07:15Z |
Scheduling time-dependent jobs under mixed deterioration
|
Gawiejnowicz, Stanislaw; Lin, Bertrand M. T. |
| 朝陽科技大學 |
2004 |
Scheduling two-component products on parallel machines
|
楊文華 |
| 朝陽科技大學 |
2005 |
Scheduling Two-Machine No-Wait Open Shops to Minimize Makespan
|
廖經芳; Ching-Fang Liaw |