|
English
|
正體中文
|
简体中文
|
Total items :0
|
|
Visitors :
51982843
Online Users :
848
Project Commissioned by the Ministry of Education Project Executed by National Taiwan University Library
|
|
|
|
Taiwan Academic Institutional Repository >
Browse by Title
|
Showing items 893486-893495 of 2348419 (234842 Page(s) Totally) << < 89344 89345 89346 89347 89348 89349 89350 89351 89352 89353 > >> View [10|25|50] records per page
| 國立中山大學 |
1996 |
Two- and three-dimentional magnetic correlations of Tb in Pb2Sr2TbCu3O8
|
S.Y. Wu;W.H. Li;K.C. Lee;J.W. Lynn;T.H. Meen;H.D. Yang |
| 國立臺灣海洋大學 |
1996 |
Two- phase Finite Element Comparative Study of a Side Structure of a Middle Size Tanker
|
Y. Sumi;W. H. Wang;other members of ISSC'94 Committee II.1, 1996,01 |
| 國立臺灣大學 |
1999 |
Two- Vs. Three-Dimensional Kinematic Analysis of Twist-Bending Movement: A Preliminary Report
|
陳昭瑩; 陳麗秋; 鄭素芳; CHEN, CHAO-YING; CHEN, LI-CHIOU; JENG, SUH-FANG |
| 國立臺灣大學 |
1999 |
Two- vs. three-dimensional method for kinematic analysis of twist-bending movement: A preliminary report.
|
Chen, CY; Chen, LC; 鄭素芳; Hong, JY; Jeng, CY; Chen, CY; Chen, LC; Jeng SF; Hong, JY; Jeng, CY |
| 國立交通大學 |
2014-12-08T15:36:00Z |
Two-additive electrolytes for superplanarizing damascene Cu metals
|
Liu, SH; Shieh, JM; Chen, C; Dai, BT; Hensen, K; Cheng, SS |
| 元培科技大學 |
2011-07 |
Two-agent scheduling with position-based deteriorating jobs and learning effects
|
吳文祥(Wu, Wen-Hsiang) |
| 國立交通大學 |
2014-12-08T15:28:10Z |
Two-agent singe-machine scheduling with release times to minimize the total weighted completion time
|
Cheng, T. C. E.; Chung, Yu-Hsiang; Liao, Shan-Ci; Lee, Wen-Chiung |
| 東海大學 |
2013 |
Two-agent single-machine scheduling of jobs with time-dependent processing times and ready times
|
Kung, J.-Y.; Chao, Y.-P.; Lee, K.-I.; Kang, C.-C.; Lin, W.-C. |
| 正修科技大學 |
2013 |
Two-Agent Single-Machine Scheduling of Jobs with Time-Dependent Processing Times and Ready Timesdependent processing times and ready timesPREPAYMENT AND DEFAULT RISK
|
龔娟宜;Yuan-Po Chao;Kuei-I Lee;Chao-Chung Kang;andWin-Chin Lin |
| 元培科技大學 |
2012-08 |
Two-agent single-machine scheduling with assignable due dates
|
吳文祥(Wu, Wen-Hsiang) |
Showing items 893486-893495 of 2348419 (234842 Page(s) Totally) << < 89344 89345 89346 89347 89348 89349 89350 89351 89352 89353 > >> View [10|25|50] records per page
|