| 臺大學術典藏 |
2020-05-04T07:44:18Z |
Schedulability Analysis of Mode Change for Imprecise Computation on Multi-Core Platforms.
|
Shih, Chi-Sheng; Yang, Chang-Min; CHI-SHENG SHIH |
| 亞洲大學 |
1993-06 |
Schedulability Analysis of Real-Time Software Using Timing Constraints Petri Nets
|
蔡進發;Jeffrey, J.P.Tsai |
| 亞洲大學 |
1993.06 |
Schedulability Analysis of Real-Time Software Using Timing Constraints Petri Nets
|
蔡進發;Jeffrey, J.P.Tsai;S.Yang;S.Yang;P.Chang;P.Chang |
| 臺大學術典藏 |
2011-02-23T13:07:03Z |
Schedulability and Fairness for Computation Tasks in Surveillance Radar Systems
|
Shih, Chi-Sheng; Ganti, Phanindra; Sha, Lui; Shih, Chi-Sheng; Ganti, Phanindra; Sha, Lui |
| 國立臺灣大學 |
2004 |
Schedulability and Fairness for Computation Tasks in Surveillance Radar Systems
|
Shih, Chi-Sheng; Ganti, Phanindra; Sha, Lui |
| 臺大學術典藏 |
2003-05 |
Schedulability and Performance Analysis of the Similarity Stack Protocol
|
Aloysius, K. Mok; Kuo, Tei-Wei; Kuo, Tei-Wei; Aloysius, K. Mok |
| 國立臺灣大學 |
2003-05 |
Schedulability and Performance Analysis of the Similarity Stack Protocol
|
Kuo, Tei-Wei; Aloysius, K. Mok |
| 臺大學術典藏 |
2018-09-10T04:32:18Z |
Schedulability and performance analysis of the similarity stack protocol
|
Kuo, T.-W.; Mok, A.K.; TEI-WEI KUO |
| 臺大學術典藏 |
1997 |
Schedulability Comparisons Among Periodic and Distance-Constrained Real-Time Schedulers
|
Hsueh, Chih-Wen; Lin, K.-J.; Hsueh, Chih-Wen; Lin, K.-J. |
| 國立臺灣大學 |
1997 |
Schedulability Comparisons Among Periodic and Distance-Constrained Real-Time Schedulers
|
Hsueh, Chih-Wen; Lin, K.-J. |
| 臺大學術典藏 |
2006 |
Schedulability Envelope for Real-Time Radar Dwell Scheduling
|
Lee, Chang-Gung; Kang, Phil-Su; Shih, Chi-Sheng; Sha, Lui; Lee, Chang-Gung; Kang, Phil-Su; Shih, Chi-Sheng; Sha, Lui |
| 國立臺灣大學 |
2006 |
Schedulability Envelope for Real-Time Radar Dwell Scheduling
|
Lee, Chang-Gung; Kang, Phil-Su; Shih, Chi-Sheng; Sha, Lui |
| 臺大學術典藏 |
2018-07-05T01:52:13Z |
Schedulability Envelope for Real-Time Radar Dwell Scheduling and Its Application to Multi-Ship Multi-Radar Systems
|
Sha, Lui; Caccamo, Marco; Shih, Chi-Sheng; Kang, Phil-Su; Lee, Chang-Gun; Lee, Chang-Gun; Kang, Phil-Su; Shih, Chi-Sheng; Caccamo, Marco; Sha, Lui |
| 國立臺灣大學 |
2004 |
Schedulability Envelope for Real-Time Radar Dwell Scheduling and Its Application to Multi-Ship Multi-Radar Systems
|
Lee, Chang-Gun; Kang, Phil-Su; Shih, Chi-Sheng; Caccamo, Marco; Sha, Lui |
| 國立臺灣大學 |
2006-12 |
Schedulability Envelope for Real-Time Radar Dwell Scheduling.
|
Lee, Chang-Gun; Kang, Phil-Su; Shih, Chi-Sheng; Sha, Lui |
| 臺大學術典藏 |
2018-09-10T04:13:37Z |
Schedulable region for VBR media transmission with optimal resource allocation and utilization
|
Chang, R.-I.; Chen, M.-C.; Ho, J.-M.; Ko, M.-T.; RAY-I CHANG |
| 元智大學 |
2005-06 |
Schedule coordination in a multiple hub transit network
|
丁慶榮; Paul Schonfeld |
| 國立交通大學 |
2017-04-21T06:55:46Z |
Schedule Coordination, Delay Propagation, and Disruption Resilience in Intermodal Logistics Networks
|
Chen, Cheng-Chieh (Frank); Tsai, Ya-Hsuan (Natalie); Schonfeld, Paul |
| 亞洲大學 |
2008-08 |
Schedule effect and laparoscopic-assisted vaginal hysterectomy
|
Chang, WC (Chang, Wei-Chun); Lin, CC (Lin, Cheng-Chieh); Chen, LM (Chen, Lu-Min); Xu, HDI (Xu, Hong-Dar Isaac); Yeh, LS (Yeh, Lian-Shung); Lin, LY (Lin, Long-Yau) |
| 亞洲大學 |
2008-08 |
Schedule effect and laparoscopic-assisted vaginal hysterectomy
|
CHANG), (Wei-Chun;Lin), 林正介(Cheng-Chieh;CHEN), (Lu-Min;Wu), (Hong-Dar Isaac;YEH), (Lian-Shung;Lin), (Long-Yau |
| 中國醫藥大學 |
2008-08 |
Schedule effect and laparoscopic-assisted vaginal hysterectomy
|
張維君(Wei-Chun Chang); 林正介(Cheng-Chieh Lin); 陳璐敏(Lu-Min Chen); 吳宏達(Hong-Dar Isaac Wu); 葉聯舜(Lian-Shung Yeh); 林隆堯(Long-Yau Lin)* |
| 中國醫藥大學 |
2007-11-16 |
Schedule Effect and Laparoscopic-Assisted Vaginal Hysterectomy
|
張維君(Wei-Chun Chang); 吳錫金(Wu,Hsi-Chin); 葉聯舜(Lian-Shung Yeh); 李正淳(Cheng-Chun Lee); 林正介(Cheng-Chieh Lin) |
| 中國醫藥大學 |
2006-08-18 |
Schedule effect and laparoscopic-assisted vaginal hysterectomy
|
張維君(Wei-Chun Chang); 林武周(Wu-Chou Lin); 葉聯舜(Lian-Shung Yeh); 洪耀欽(Yao-Ching Hung) |
| 國立臺灣大學 |
2008 |
Schedule Execution for Two-Machine Flow-Shop
|
Matsveichuck, N.M.; Sotskov, Y.N.; Lai, T.C. |
| 臺大學術典藏 |
2019-12-20T08:43:10Z |
Schedule planning model for onshore wind turbine construction project subjected to the impact of wind [陸上風力發電機組興建工程受風不確定性因素影響之工期預測模式]
|
SY-JYE GUO;Chiu, C.-H.;Chen, J.-H.;Guo, S.-J.; Guo, S.-J.; Chen, J.-H.; Chiu, C.-H.; SY-JYE GUO |