| 中原大學 |
2000-12 |
Scheduling job iwth burn in board constraint on semiconductor burn-in operations to minimize the mean flow time
|
Hui-Mei Wang;Ling-Huey Su;Pei-Chann Chang; |
| 國立東華大學 |
2009-08 |
Scheduling Jobs in Grids Adaptively
|
Chang,Ruay-Shiung; Lin,Chun-Fu; Lin,Chih-Yuan |
| 朝陽科技大學 |
2009 |
Scheduling jobs on a single machine to maximize the total revenue of jobs
|
楊文華 |
| 元智大學 |
2009-05 |
Scheduling jobs under constant period-by-period resource availability to maximize project profit at a due date
|
徐旭昇; Zhi-Jie Chen |
| 朝陽科技大學 |
2007 |
Scheduling Jobs with declining revenues
|
楊文華; 李宗政 |
| 臺大學術典藏 |
2020-05-04T07:44:35Z |
Scheduling Jobs with Multiple Feasible Intervals.
|
Shih, Chi-Sheng; Liu, Jane W.-S.; Cheong, Infan Kuok; CHI-SHENG SHIH |
| 中華大學 |
2009 |
Scheduling LED packaging and testing operations on die bonder
|
莊恬晞; Chuang, Tien-Hsi |
| 臺大學術典藏 |
2020-03-06T03:42:29Z |
Scheduling linearly shortening jobs under precedence constraints
|
Gawiejnowicz S.;Lai T.-C.;Chiang M.-H.; Gawiejnowicz S.; Lai T.-C.; Chiang M.-H.; MING-HUANG CHIANG |
| 國立成功大學 |
2000-09 |
Scheduling loop applications in software distributed shared memory systems
|
Liang, Tyng-Yeu; Shieh, Ce-Kuen; Liu, Deh-Cheng |
| 臺大學術典藏 |
2020-05-04T07:48:21Z |
Scheduling Low-Utilized Real-Time Systems with End-to-End Timing Constraints.
|
CHIH-WEN HSUEH; Hsueh, Chih-Wen; Chuang, Chih-Yao;Chen, Yung-Chieh;Hsueh, Chih-Wen; Chuang, Chih-Yao; Chen, Yung-Chieh |
| 國立交通大學 |
2017-04-21T06:49:57Z |
Scheduling MapReduce Tasks on Virtual MapReduce Clusters from a Tenant\'s Perspective
|
Lin, Jia-Chun; Lee, Ming-Chang; Yahyapour, Ramin |
| 國立交通大學 |
2014-12-16T06:14:29Z |
Scheduling method for supporting quality of service (QoS) in wireless local area network (WLAN)
|
Huang; Ching Yao; Fan; Yu Long |
| 國立交通大學 |
2014-12-16T06:16:12Z |
Scheduling method for supporting quality of service (QoS) in wireless local area network (WLAN)
|
Huang, Ching Yao; Fan, Yu Long |
| 國立臺灣科技大學 |
2018 |
Scheduling methods to optimize dependent programs for GPU architecture
|
Liao, W.-C.;Chang, Y.-M.;Wang, S.-C.;Yang, C.-C.;Lee, J.-K.;Hwang, Y.-S. |
| 臺大學術典藏 |
2020-05-04T08:02:36Z |
Scheduling multiple multicast for heterogeneous network of workstations with non-blocking message-passing
|
Yeh, S.-H.; Wu, J.-J.; Liu, P.; PANGFENG LIU |
| 臺大學術典藏 |
2020-05-04T08:02:52Z |
Scheduling Multiple Multicast for Heterogeneous Network of Workstations with Non-Blocking Message-Passing.
|
PANGFENG LIU; Liu, Pangfeng; Wu, Jan-Jan; Yeh, Shih-Hsien |
| 國立臺灣科技大學 |
2007 |
Scheduling multiple orders with preemptive jobs and resource dependence times
|
Chuang S.P.; Hsu T.S.; Yang C.L. |
| 臺大學術典藏 |
2018-09-10T04:53:05Z |
Scheduling multiple queries on a parallel machine
|
Wolf, Joel L.;Turek, John;Chen, Ming-Syan;Yu, Philip S.; Wolf, Joel L.; Turek, John; Chen, Ming-Syan; Yu, Philip S.; MING-SYAN CHEN |
| 國立成功大學 |
1999-08 |
Scheduling multiprocessor job with resource and timing constraints using neural networks
|
Huang, Yueh-Min; Chen, Ruey-Maw |
| 中原大學 |
2001 |
Scheduling n jobs on one machine to minimize the maximum lateness with a minimum number of tardy jobs
|
Pei-Chann Chang;Ling-Huey Su |
| 國立成功大學 |
2009-03 |
Scheduling non-uniform data with expected-time constraint in wireless multi-channel environments
|
Chung, Yu-Chi; Lin, Lanturn; Lee, Chiang |
| 國立交通大學 |
2014-12-08T15:08:21Z |
Scheduling of a two-stage differentiation flowshop to minimize weighted sum of machine completion times
|
Cheng, T. C. E.; Lin, B. M. T.; Tian, Y. |
| 元智大學 |
2003-04 |
Scheduling of drilling operations in printed circuit board factory
|
張百棧; Jih-Chang Hsieh; Lei-Chao Hsu |
| 國立臺灣大學 |
1994-09 |
Scheduling of hydroelectric generations using artificial neural networks
|
Liang, R.-H.; Hsu, Y.-Y. |
| 中華大學 |
2010 |
Scheduling of Job Combination and Dispatching Strategy for Grid and Cloud System
|
許慶賢; Hsu, Ching-Hsien |