| 臺大學術典藏 |
2020-05-04T08:02:36Z |
Scheduling multiple multicast for heterogeneous network of workstations with non-blocking message-passing
|
Yeh, S.-H.; Wu, J.-J.; Liu, P.; PANGFENG LIU |
| 臺大學術典藏 |
2020-05-04T08:02:52Z |
Scheduling Multiple Multicast for Heterogeneous Network of Workstations with Non-Blocking Message-Passing.
|
PANGFENG LIU; Liu, Pangfeng; Wu, Jan-Jan; Yeh, Shih-Hsien |
| 國立臺灣科技大學 |
2007 |
Scheduling multiple orders with preemptive jobs and resource dependence times
|
Chuang S.P.; Hsu T.S.; Yang C.L. |
| 臺大學術典藏 |
2018-09-10T04:53:05Z |
Scheduling multiple queries on a parallel machine
|
Wolf, Joel L.;Turek, John;Chen, Ming-Syan;Yu, Philip S.; Wolf, Joel L.; Turek, John; Chen, Ming-Syan; Yu, Philip S.; MING-SYAN CHEN |
| 國立成功大學 |
1999-08 |
Scheduling multiprocessor job with resource and timing constraints using neural networks
|
Huang, Yueh-Min; Chen, Ruey-Maw |
| 中原大學 |
2001 |
Scheduling n jobs on one machine to minimize the maximum lateness with a minimum number of tardy jobs
|
Pei-Chann Chang;Ling-Huey Su |
| 國立成功大學 |
2009-03 |
Scheduling non-uniform data with expected-time constraint in wireless multi-channel environments
|
Chung, Yu-Chi; Lin, Lanturn; Lee, Chiang |
| 國立交通大學 |
2014-12-08T15:08:21Z |
Scheduling of a two-stage differentiation flowshop to minimize weighted sum of machine completion times
|
Cheng, T. C. E.; Lin, B. M. T.; Tian, Y. |
| 元智大學 |
2003-04 |
Scheduling of drilling operations in printed circuit board factory
|
張百棧; Jih-Chang Hsieh; Lei-Chao Hsu |
| 國立臺灣大學 |
1994-09 |
Scheduling of hydroelectric generations using artificial neural networks
|
Liang, R.-H.; Hsu, Y.-Y. |
| 中華大學 |
2010 |
Scheduling of Job Combination and Dispatching Strategy for Grid and Cloud System
|
許慶賢; Hsu, Ching-Hsien |
| 國立交通大學 |
2014-12-08T15:36:09Z |
Scheduling of multiple in-line steppers for semiconductor wafer fabs
|
Chiou, Chie-Wun; Wu, Muh-Cherng |
| 臺大學術典藏 |
2018-09-10T15:34:07Z |
Scheduling of optimal DASH streaming
|
Liu, Y.-C.; Chung, W.-C.; Lee, M.-H.; Wang, K.-J.; Chang, S.-H.; Wu, C.-J.; Chang, R.-I.; Ho, J.-M.; RAY-I CHANG |
| 建國科技大學 |
2010 |
Scheduling of parallel machines with job delivery coordination
|
許勝源 |
| 亞洲大學 |
1995 |
Scheduling of precedence contrained tasks on multiprocessor systems
|
Chih Yeh;Shian shyong Tseng;Chao-Tung Yang |
| 國立臺灣大學 |
2005 |
Scheduling of Query Execution Plans in Distributed-Memory Multiprocessor Database Systems
|
Wu, Jun; Chen, Jian-Jia; Hsueh, Chih-Wen; Kuo, Tei-Wei |
| 臺大學術典藏 |
2004 |
Scheduling of Query Execution Plans in Symmetric Multiprocessor Database Systems
|
Wu, Jun; Chen, Jian-Jia; Hsueh, Chih-Wen; Kuo, Tei-Wei; Wu, Jun; Chen, Jian-Jia; Hsueh, Chih-wen; Kuo, Tei-Wei |
| 國立臺灣大學 |
2004 |
Scheduling of Query Execution Plans in Symmetric Multiprocessor Database Systems
|
Wu, Jun; Chen, Jian-Jia; Hsueh, Chih-wen; Kuo, Tei-Wei |
| 臺大學術典藏 |
2020-05-04T08:07:12Z |
Scheduling of Query Execution Plans in Symmetric Multiprocessor Database Systems.
|
Wu, Jun; Chen, Jian-Jia; Hsueh, Chih-wen; Kuo, Tei-Wei; TEI-WEI KUO |
| 國立交通大學 |
2014-12-08T15:33:49Z |
Scheduling of transportation fleet maintenance service by an improved Lipschitz optimization algorithm
|
Yao, Ming-Jong; Huang, Jia-Yen |
| 臺大學術典藏 |
2020-05-04T08:02:28Z |
Scheduling of variable-time jobs for distributed systems with heterogeneous processor cardinality
|
Wu, J.-J.; Chang, H.-J.; Ho, Y.-F.; Liu, P.; PANGFENG LIU |
| 國立臺灣科技大學 |
2010 |
Scheduling on identical machines with batch arrivals
|
Chung T.-P.; Liao C.-J.; Su L.-H. |
| 國立臺灣科技大學 |
2008 |
Scheduling on identical machines with batch arrivals in semiconductor testing house
|
Chung T.P.; Liao C.J.; Su L.H. |
| 中原大學 |
2009 |
Scheduling on identical parallel machines to minimize total completion time with deadline and machine eligibility constraints
|
Ling-Huey Su |
| 國立交通大學 |
2017-04-21T06:55:56Z |
Scheduling online mixed-parallel workflows of rigid tasks in heterogeneous multi-cluster environments
|
Wang, Yi-Rong; Huang, Kuo-Chan; Wang, Feng-Jian |
| 南台科技大學 |
2000 |
Scheduling Outpatient Appointment with Walk-in
|
F. Huarng;H. Hou ; J. Lee |
| 中原大學 |
2009 |
Scheduling parallel machines with resource-dependent processing times
|
Ling-Huey Su; Chun-Yuan Lien |
| 國立臺灣大學 |
1994-05 |
Scheduling parallel tasks on hypercubes
|
Lin, J.-F.; Chen, S.-J. |
| 臺大學術典藏 |
2018-09-10T04:53:33Z |
Scheduling parallel tasks on hypercubes
|
Lin, J.-F.;Chen, S.-J.; Lin, J.-F.; Chen, S.-J.; SAO-JIE CHEN |
| 臺大學術典藏 |
1994 |
Scheduling Parallel Tasks With Setup Time on Hypercube Systems
|
Lin, J. F.; See, W. B.; Chen, Sao-Jie; Lin, J. F.; See, W. B.; 陳少傑; Chen, Sao-Jie |
| 國立臺灣大學 |
1994 |
Scheduling Parallel Tasks With Setup Time on Hypercube Systems
|
Lin, J. F.; See, W. B.; 陳少傑; Lin, J. F.; See, W. B.; Chen, Sao-Jie |
| 朝陽科技大學 |
2014-06-03 |
Scheduling Patients in Hospitals based on Multi-agent Systems
|
Hsieh, Fu-Shiung;Lin, Jim-Bon; 謝富雄 |
| 國立成功大學 |
2012-09-05 |
Scheduling performance enhancement by network coding in wireless mesh networks
|
Li, J. -S.; Liu, K. -H.; Chilamkurti, N.; Shu, L.; Duong, T. Q. |
| 國立勤益科技大學 |
2007 |
Scheduling Performance Evaluation in Hybrid Production Environments
|
Wang, W.P. |
| 國立成功大學 |
2012-09 |
Scheduling Periodic Continuous Queries in Real-Time Data Broadcast Environments
|
Wang, Hongya; Xiao, Yingyuan; Shu, LihChyun |
| 國立交通大學 |
2014-12-08T15:05:51Z |
SCHEDULING PRECEDENCE GRAPHS IN SYSTEMS WITH INTERPROCESSOR COMMUNICATION TIMES
|
HWANG, JJ; CHOW, YC; ANGER, FD; LEE, CY |
| 朝陽科技大學 |
2005 |
Scheduling Preemptive Open Shops to Minimize Total Tardiness
|
廖經芳; Ching-Fang Liaw |
| 國立臺灣科技大學 |
2008 |
Scheduling Project Tasks under Resource Constrained using Design Structure Matrix and Quality Equations
|
陳戴幸 |
| 臺大學術典藏 |
2018-09-10T04:32:50Z |
Scheduling real-time dwells using tasks with synthetic periods
|
Shih, C.-S.; Gopalakrishnan, S.; Ganti, P.; Caccamo, M.; Sha, L.; CHI-SHENG SHIH |
| 臺大學術典藏 |
2020-05-04T07:44:35Z |
Scheduling Real-Time Dwells Using Tasks with Synthetic Periods.
|
Shih, Chi-Sheng; Gopalakrishnan, Sathish; Ganti, Phanindra; Caccamo, Marco; Sha, Lui; CHI-SHENG SHIH |
| 國立臺灣科技大學 |
2006 |
Scheduling real-time multi-processor systems with distance-constrained tasks using the early-release-fair model
|
Chen, D.-R.;Hsu, C.-C.;Wang, C.-M. |
| 臺大學術典藏 |
2001-01 |
Scheduling Real-Time Systems with End-to-End Timing Constraints Using the Distributed Pinwheel Model
|
Hsueh, Chih-Wen; Lin, Kwei-Jay; Hsueh, Chih-wen; Lin, Kwei-Jay |
| 國立臺灣大學 |
2001-01 |
Scheduling Real-Time Systems with End-to-End Timing Constraints Using the Distributed Pinwheel Model
|
Hsueh, Chih-wen; Lin, Kwei-Jay |
| 臺大學術典藏 |
2020-05-04T07:48:20Z |
Scheduling real-time systems with end-to-end timing constraints using the distributed pinwheel model
|
Hsueh, C.-W.; Lin, K.-J.; CHIH-WEN HSUEH |
| 國立交通大學 |
2014-12-08T15:08:00Z |
Scheduling semiconductor in-line steppers in new product/process introduction scenarios
|
Wu, Muh-Cherng; Chiou, Chie-Wun |
| 臺大學術典藏 |
2018-09-10T03:48:04Z |
Scheduling semiconductor wafer fabrication by using ordinal optimization-based simulation
|
Hsieh, B.-W.; Chen, C.-H.; Chang, S.-C.; SHI-CHUNG CHANG |
| 中原大學 |
1996-07 |
Scheduling Short-Term Hydrothermal Generation Using Evolutionary Programming Techniques
|
P.C. Yang;H.T. Yang;C.L. Huang |
| 國立交通大學 |
2020-07-01T05:22:10Z |
Scheduling step-deteriorating jobs to minimize the total completion time
|
Cheng, T. C. E.; Kravchenko, Svetlana A.; Lin, Bertrand M. T. |
| 朝陽科技大學 |
2007 |
Scheduling strategy for realistic implementation of video on demand over IPTV system
|
張林煌; 廖明沂; 廖俊鑑; L.-H. Chang; M.-Y Liao; J.-J. Liaw |
| 育達商業科技大學 |
2005 |
Scheduling Support System for the Coordinated Scheduling of Production and Delivery
|
Jason Chao-Hsien Pan;Zhi-Lun Wu;Ming-Feng Yang |