|
English
|
正體中文
|
简体中文
|
總筆數 :0
|
|
造訪人次 :
52576632
線上人數 :
752
教育部委託研究計畫 計畫執行:國立臺灣大學圖書館
|
|
|
顯示項目 743411-743420 / 2348609 (共234861頁) << < 74337 74338 74339 74340 74341 74342 74343 74344 74345 74346 > >> 每頁顯示[10|25|50]項目
| 臺大學術典藏 |
2001-01 |
Scheduling Real-Time Systems with End-to-End Timing Constraints Using the Distributed Pinwheel Model
|
Hsueh, Chih-Wen; Lin, Kwei-Jay; Hsueh, Chih-wen; Lin, Kwei-Jay |
| 國立臺灣大學 |
2001-01 |
Scheduling Real-Time Systems with End-to-End Timing Constraints Using the Distributed Pinwheel Model
|
Hsueh, Chih-wen; Lin, Kwei-Jay |
| 臺大學術典藏 |
2020-05-04T07:48:20Z |
Scheduling real-time systems with end-to-end timing constraints using the distributed pinwheel model
|
Hsueh, C.-W.; Lin, K.-J.; CHIH-WEN HSUEH |
| 國立交通大學 |
2014-12-08T15:08:00Z |
Scheduling semiconductor in-line steppers in new product/process introduction scenarios
|
Wu, Muh-Cherng; Chiou, Chie-Wun |
| 臺大學術典藏 |
2018-09-10T03:48:04Z |
Scheduling semiconductor wafer fabrication by using ordinal optimization-based simulation
|
Hsieh, B.-W.; Chen, C.-H.; Chang, S.-C.; SHI-CHUNG CHANG |
| 中原大學 |
1996-07 |
Scheduling Short-Term Hydrothermal Generation Using Evolutionary Programming Techniques
|
P.C. Yang;H.T. Yang;C.L. Huang |
| 國立交通大學 |
2020-07-01T05:22:10Z |
Scheduling step-deteriorating jobs to minimize the total completion time
|
Cheng, T. C. E.; Kravchenko, Svetlana A.; Lin, Bertrand M. T. |
| 朝陽科技大學 |
2007 |
Scheduling strategy for realistic implementation of video on demand over IPTV system
|
張林煌; 廖明沂; 廖俊鑑; L.-H. Chang; M.-Y Liao; J.-J. Liaw |
| 育達商業科技大學 |
2005 |
Scheduling Support System for the Coordinated Scheduling of Production and Delivery
|
Jason Chao-Hsien Pan;Zhi-Lun Wu;Ming-Feng Yang |
| 朝陽科技大學 |
2015-11 |
Scheduling Sustainable Supply Chains based on Multi-agent Systems and Workflow Models
|
HSIEH, FU-SHIUNG |
顯示項目 743411-743420 / 2348609 (共234861頁) << < 74337 74338 74339 74340 74341 74342 74343 74344 74345 74346 > >> 每頁顯示[10|25|50]項目
|