| 國立臺灣科技大學 |
2004 |
Scheduling system with focus on practical concerns in repetitive projects
|
Yang, I-Tung |
| 淡江大學 |
2004-07 |
Scheduling system with focus on practical concerns in repetitive projects
|
楊亦東; Yang, I-tung; Ioannou, Photios G. |
| 臺大學術典藏 |
2018-09-10T03:47:49Z |
Scheduling tasks with variable deadlines
|
Shih, C.-S.; Sha, L.; Liu, J.; CHI-SHENG SHIH |
| 臺大學術典藏 |
2020-05-04T07:44:36Z |
Scheduling Tasks With Variable Deadlines.
|
Sha, Lui; Liu, Jane W.-S.; CHI-SHENG SHIH; Shih, Chi-Sheng |
| 臺大學術典藏 |
1985-12 |
Scheduling the AIM Line at the North Carolina Works
|
Yu, Chang-Sung; Yu, Chang-Sung |
| 國立臺灣大學 |
1985-12 |
Scheduling the AIM Line at the North Carolina Works
|
游張松; Yu, Chang-Sung |
| 國立中山大學 |
1997 |
Scheduling the partially parallel loops at run-time
|
Tze-Nan Sheng;Po-Hsueh Hsu;T.C. Huang |
| 國立交通大學 |
2014-12-08T15:07:15Z |
Scheduling time-dependent jobs under mixed deterioration
|
Gawiejnowicz, Stanislaw; Lin, Bertrand M. T. |
| 朝陽科技大學 |
2004 |
Scheduling two-component products on parallel machines
|
楊文華 |
| 朝陽科技大學 |
2005 |
Scheduling Two-Machine No-Wait Open Shops to Minimize Makespan
|
廖經芳; Ching-Fang Liaw |
| 朝陽科技大學 |
2004 |
Scheduling Two-Machine Preemptive Open Shops to Minimize Total Completion Time
|
廖經芳; Ching-Fang Liaw |
| 國立成功大學 |
2012-12 |
Scheduling two-stage hybrid flow shops with parallel batch, release time, and machine eligibility constraints
|
Wang, I. -Lin; Yang, Taho; Chang, Yu-Bang |
| 國立臺灣科技大學 |
2004 |
Scheduling under machine breakdown in a continuous industry
|
Liao, C. J. ; Chen, W. J. |
| 國立政治大學 |
1990 |
Scheduling unit processing time jobs on a single machine with multiple criteria
|
陳春龍; Chen, Chuen-lung;Bulfin, Robert L. |
| 國立成功大學 |
2013-09 |
Scheduling unrelated parallel machines in semiconductor manufacturing by problem reduction and local search heuristics
|
Wang, I-Lin; Wang, Yi-Chi; Chen, Chih-Wei |
| 朝陽科技大學 |
2003 |
Scheduling Unrelated Parallel Machines to Minimize Total Weighted Tardiness
|
廖經芳;陳銘芷;林晹桂; Ching-Fang Liaw;Yang-Kuei Lin;Chun-Yuan Cheng;Mingchih Chen |
| 國立勤益科技大學 |
2012-07 |
Scheduling unrelated parallel machines with setup consideration applying GA and response surface method
|
王文派 |
| 元智大學 |
2007-04 |
Scheduling via Agent Negotiation: A Fuzzy Constraint-based Approach
|
賴國華; Meng-Wen Lin; Bo-Rue Kao |
| 國立交通大學 |
2014-12-08T15:37:34Z |
Scheduling with Centralized and Decentralized Batching Policies in Concurrent Open Shops
|
Lin, B. M. T.; Cheng, T. C. E. |
| 國立臺灣科技大學 |
2004 |
Scheduling with Different maintenance Polices in a textile company
|
Chen, W. J. ; Liao, C. J. |
| 國立臺灣科技大學 |
2016 |
Scheduling with multi-attribute set-up times on unrelated parallel machines
|
Liao, C.-J;Lee, C.-H;Tsai, H.-T. |
| 國立臺灣科技大學 |
2012 |
Scheduling with multi-attribute setup times
|
Lee, C.-H.;Liao, C.-J.;Chao, C.-W. |
| 國立臺灣科技大學 |
2012 |
Scheduling with multi-attribute setup times
|
Lee, C.-H.;Liao, C.-J.;Chao, C.-W. |
| 國立臺灣科技大學 |
2014 |
Scheduling with multi-attribute setup times on two identical parallel machines
|
Lee, C.-H.;Liao, C.-J.;Chung, T.-P. |
| 國立成功大學 |
2024 |
Scheduling with Obligatory Tests
|
Dogeas;K;Erlebach;T;Liang;Y, -C. |