| 亞洲大學 |
2008-08 |
Schedule effect and laparoscopic-assisted vaginal hysterectomy
|
Chang, WC (Chang, Wei-Chun); Lin, CC (Lin, Cheng-Chieh); Chen, LM (Chen, Lu-Min); Xu, HDI (Xu, Hong-Dar Isaac); Yeh, LS (Yeh, Lian-Shung); Lin, LY (Lin, Long-Yau) |
| 亞洲大學 |
2008-08 |
Schedule effect and laparoscopic-assisted vaginal hysterectomy
|
CHANG), (Wei-Chun;Lin), 林正介(Cheng-Chieh;CHEN), (Lu-Min;Wu), (Hong-Dar Isaac;YEH), (Lian-Shung;Lin), (Long-Yau |
| 中國醫藥大學 |
2008-08 |
Schedule effect and laparoscopic-assisted vaginal hysterectomy
|
張維君(Wei-Chun Chang); 林正介(Cheng-Chieh Lin); 陳璐敏(Lu-Min Chen); 吳宏達(Hong-Dar Isaac Wu); 葉聯舜(Lian-Shung Yeh); 林隆堯(Long-Yau Lin)* |
| 中國醫藥大學 |
2007-11-16 |
Schedule Effect and Laparoscopic-Assisted Vaginal Hysterectomy
|
張維君(Wei-Chun Chang); 吳錫金(Wu,Hsi-Chin); 葉聯舜(Lian-Shung Yeh); 李正淳(Cheng-Chun Lee); 林正介(Cheng-Chieh Lin) |
| 國立臺灣大學 |
2008 |
Schedule Execution for Two-Machine Flow-Shop
|
Matsveichuck, N.M.; Sotskov, Y.N.; Lai, T.C. |
| 臺大學術典藏 |
2019-12-20T08:43:10Z |
Schedule planning model for onshore wind turbine construction project subjected to the impact of wind [陸上風力發電機組興建工程受風不確定性因素影響之工期預測模式]
|
SY-JYE GUO;Chiu, C.-H.;Chen, J.-H.;Guo, S.-J.; Guo, S.-J.; Chen, J.-H.; Chiu, C.-H.; SY-JYE GUO |
| 國立臺灣大學 |
2000 |
Schedule to Inject in Vitro Matued Oocytes May Increase Pregnancy after Intracytoplasmic Injection
|
陳思原; 陳信孚; 連義隆; 何弘能; 楊友仕; CHEN, SHEE-UAN; CHEN, HSIN-FU; LIEN, YIH-RON; HO, HONG-NERNG; YANG, YU-SHIH |
| 臺大學術典藏 |
2018-09-10T03:32:46Z |
Schedule to inject in vitro matured oocytes may increase pregnancy after intracytoplasmic sperm injection
|
Chen, S.-U. and Chen, H.-F. and Lien, Y.-R. and Ho, H.-N. and Chang, H.-C. and Yang, Y.-S.; HONG-NERNG HO |
| 臺大學術典藏 |
2018-09-10T03:24:07Z |
Schedule to inject in vitro matured oocytes may increase pregnancy after intracytoplasmic sperm injection
|
YU-SHIH YANG; Chen, S.-U. and Chen, H.-F. and Lien, Y.-R. and Ho, H.-N. and Chang, H.-C. and Yang, Y.-S. |
| 臺大學術典藏 |
2020-02-06T06:50:20Z |
Schedule to inject in vitro matured oocytes may increase pregnancy after intracytoplasmic sperm injection
|
Lien Y.-R; Ho H.-N; Chang H.-C; Yang Y.-S.; Chen H.-F; SHEE-UAN CHEN; Shee-Uan Chen;Chen H.-F;Lien Y.-R;Ho H.-N;Chang H.-C;Yang Y.-S. |
| 臺大學術典藏 |
2020-02-17T07:43:57Z |
Schedule to inject in vitro matured oocytes may increase pregnancy after intracytoplasmic sperm injection
|
Yang Y.-S.; Chang H.-C; HONG-NERNG HO; Lien Y.-R; Chen H.-F; Chen S.-U; Chen S.-U;Chen H.-F;Lien Y.-R;Hong-Nerng Ho;Chang H.-C;Yang Y.-S. |
| 臺大學術典藏 |
2020-02-17T08:07:26Z |
Schedule to inject in vitro matured oocytes may increase pregnancy after intracytoplasmic sperm injection
|
Chen S.-U;Chen H.-F;Lien Y.-R;Ho H.-N;Chang H.-C;Yu-Shih Yang; Chen S.-U; Chen H.-F; Lien Y.-R; Ho H.-N; Chang H.-C; YU-SHIH YANG |
| 臺大學術典藏 |
2021-01-26T02:27:59Z |
Schedule to inject in vitro matured oocytes may increase pregnancy after intracytoplasmic sperm injection
|
Chen S.-U.;Chen H.-F.;Lien Y.-R.;Ho H.-N.;Hong-Chiang Chang;Yang Y.-S.; Chen S.-U.; Chen H.-F.; Lien Y.-R.; Ho H.-N.; HONG-CHIANG CHANG; Yang Y.-S. |
| 臺大學術典藏 |
2020-02-19T01:36:00Z |
Schedule to inject in vitro matured oocytes may increase pregnancy after intracytoplasmic sperm injection
|
Chen S.-U;Chen H.-F;Yih-Ron Lien;Ho H.-N;Chang H.-C;Yang Y.-S.; Chen S.-U; Chen H.-F; YIH-RON LIEN; Ho H.-N; Chang H.-C; Yang Y.-S. |
| 國立臺灣大學 |
1999 |
Schedule-Dependence of C-Cam1 Adenovirus Gene Therapy in a Prostate Cancer Model
|
林淑華; 蒲永孝; 羅衛平; 王顏; LIN, SHU-WHA; PU, YEONG-SHIAU; LUO, WEI- PING; WANG, YAN |
| 臺大學術典藏 |
2021-02-02T00:47:10Z |
Schedule-dependence of C-CAM1 adenovirus gene therapy in a prostate cancer model
|
Lin S.-H.;Yeong-Shiau Pu;Lou W.;Wang Y.;Logothetis C.J.; Lin S.-H.; YEONG-SHIAU PU; Lou W.; Wang Y.; Logothetis C.J. |
| 義守大學 |
2005-11 |
Scheduled shared-tree multicasting for Bluetooth networks
|
San-Yuan Wang |
| 國立交通大學 |
2019-04-02T06:04:42Z |
Scheduler design issues for wireless high-speed data systems
|
Huang, CY; Su, HY |
| 國立交通大學 |
2014-12-08T15:26:11Z |
Schedulers for 1xEV-DO: Third generation wireless high-speed data systems
|
Huang, CY; Su, HY; Vitebsky, S; Chen, PC |
| 國立交通大學 |
2014-12-08T15:44:36Z |
Scheduling a hybrid MTO/MTS semiconductor fab with machine-dedication features
|
Wu, Muh-Cherng; Jiang, Jr-Hsiung; Chang, Wen-Jen |
| 南台科技大學 |
1993-05 |
Scheduling a Plastic Injection Molding Plant
|
曾文宏; Wenhung Tseng; Robert L. Bulfin |
| 國立政治大學 |
1994 |
SCHEDULING A SINGLE MACHINE TO MINIMIZE TWO CRITERIA: MAXIMUM TARDINESS AND NUMBER OF TARDY JOBS
|
陳春龍; Chen, Chuen-Lung;BULFIN, ROBERT L. |
| 元培科技大學 |
2006 |
Scheduling Algorithm and Evaluating Performance of a Novel 3D-VOQ switch
|
Ding-Jyh Tsaur; Hsuan-Kuei Cheng; Chia-Lung Liu; Woei Lin |
| 國立臺灣大學 |
1994 |
Scheduling algorithm for nonpreemptive multiprocessor tasks
|
Lin, J. -F.; Chen, S. -J. |
| 臺大學術典藏 |
2018-09-10T04:53:33Z |
Scheduling algorithm for nonpreemptive multiprocessor tasks
|
Lin, J.-F.;Chen, S.-J.; Lin, J.-F.; Chen, S.-J.; SAO-JIE CHEN |
| 國立中山大學 |
1996-03 |
Scheduling an Overloaded Real-Time System
|
Shyh-In Hwang;Chia-Mei Chen;Ashok K. Agrawala |
| 臺大學術典藏 |
2022-05-30T07:09:46Z |
Scheduling and co-ordination of multi-suppliers single-warehouse-operator single-manufacturer supply chains with variable production rates and storage costs
|
Choi T.-M., Yeung W.-K., Cheng T.C.E.; Choi T.-M.; Yeung W.-K.; Cheng T.C.E.; TSAN MING CHOI |
| 國立交通大學 |
2018-08-21T05:57:03Z |
Scheduling and Control of a Cloud Robot for Reception and Guidance
|
Song, Kai-Tai; Chiu, Yu-Heng; Song, Shao-Huan; Zinchenko, Kateryna |
| 國立交通大學 |
2020-02-02T23:55:33Z |
Scheduling and Control of a Wafer Transfer Robot for Foundry Equipment Innovation Competition
|
Song, Kai-Tai; Ou, Song-Qing; Yang, Cheng-An; Sun, Yu-Xuan; Kang, Li-Ren; Wang, Zhen-Yu; Wang, Yu-Shin; Lu, Pei-Chun; Ko, Chun-Long; Chen, Yao Hsiang |
| 中華大學 |
2006 |
Scheduling and Control TFT-LCD Cell Plants Using Drum-Buffer-Rope Systems
|
吳鴻輝; Wu, Horng-Huei |
| 臺大學術典藏 |
2021-02-04T02:30:14Z |
Scheduling and Cutting Parameters Optimization for Parallel Turning Machines with Energy Consumption and Tool Life Considerations
|
Wu, C.-H.;Ong, S.-T.; Wu, C.-H.; Ong, S.-T.; CHENG-HUNG WU |
| 淡江大學 |
2012-11-04 |
Scheduling and Performance Analysis of a Long-Term Evolution System
|
Tseng, Hsien-Wei; Lee, Wei-Chen; Sheu, Chorng-Ren; Lee, Yang-Han; Jan, Yih-Guang |
| 臺大學術典藏 |
2018-09-10T04:12:23Z |
Scheduling and processor allocation for parallel execution of multi-join queries
|
Chen, Ming-Syan; Yu, Philip S.; Wu, Kun-Lung; MING-SYAN CHEN |
| 國立臺灣海洋大學 |
2012-08 |
Scheduling annual surveys for ship fleet: a case of tramp shipping services
|
Hua-An Lu;Yu-Chang Hsu |
| 國立成功大學 |
2023-12 |
Scheduling coflows for minimizing the total weighted completion time in heterogeneous parallel networks
|
Chen;Chi-Yeh |
| 東海大學 |
2014 |
Scheduling contention-free broadcasts in heterogeneous networks
|
Hsu, C.-H.; Chen, T.-L.; Yang, C.-T.; Chu, H.-C. |
| 中華大學 |
2005 |
Scheduling Contention-Free Irregular Redistribution in Parallelizing Compilers
|
許慶賢; Hsu, Ching-Hsien |
| 中華大學 |
2007 |
Scheduling Contention-Free Irregular Redistributions in Parallelizing Compilers
|
許慶賢; Hsu, Ching-Hsien |
| 中華大學 |
2005 |
Scheduling Convex Bipartite Communications Toward Efficient GEN_BLOCK Transformations
|
許慶賢; Hsu, Ching-Hsien |
| 東海大學 |
2005-11-02 |
Scheduling convex bipartite communications toward efficient GEN_BLOCK transformations
|
Hsu, C.-H., Chen, S.-C., Lan, C.-Y., Yang, C.-T., Li, K.-C. |
| 淡江大學 |
2005-02 |
Scheduling Delay Minimization for Non-UGS Data in Multi-Channel HFC Network
|
李維聰; Lee, Wei-tsong; Chu, Kuo-chi; Chung, Kun-chen; Pan, Jen-yi; Chung, Pau-choo |
| 國立成功大學 |
2005-04 |
Scheduling delay minimization for non-UGS data in multi-channel HFC network
|
Lee, Wei-Tsong; Chu, Kuo-Chi; Chung, Kun-Chen; Pan, Jen-Yi; Chung, Pau-Choo |
| 臺大學術典藏 |
2006 |
Scheduling dependent items in data broadcasting environments
|
Hung, H.-P.; Huang, J.-W.; Huang, J.-L.; Chen, M.-S.; MING-SYAN CHEN |
| 國立臺灣海洋大學 |
2009-10 |
Scheduling Deteriorating Jobs to Minimize the Makespan on a Single Machine
|
Chin-Chia Wu; Yau-Ren Shiau; Ling-Huei Lee; Wen-Chiung Lee |
| 國立成功大學 |
2017 |
Scheduling divisible loads on heterogeneous linear networks using pipelined communications
|
Chen, Chen C.-Y. |
| 南台科技大學 |
2004-03 |
Scheduling Expected-Time Data in Wireless Multi-channel Environments
|
陳朝鈞; Yu-Chi Chung;Lanturn Lin;Chao-Chun Chen;Chiang Lee |
| 臺大學術典藏 |
2018-09-10T03:48:04Z |
Scheduling flexible flow shops of no setup cost by a Lagrangian relaxation and network flow approach
|
SHI-CHUNG CHANG; Hsieh, Fu-Shiung; Chang, Shi-Chung;Liao, Da-Yin;Hsieh, Fu-Shiung; Chang, Shi-Chung; Liao, Da-Yin |
| 國立臺灣大學 |
1991-04 |
Scheduling flexible flow shops of no setup cost by a Lagrangian relaxation and network flow approach
|
Chang, Shi-Chung; Liao, Da-Yin; Hsieh, Fu-Shiung |
| 國立臺灣大學 |
1992-05 |
Scheduling flexible flow shops with no setup effects
|
Chang, Shi-Chung; Liao, Da-Yin |
| 國立臺灣大學 |
1994 |
Scheduling Flexible Flow Shops with No Setup Effects
|
張時中; Liao, Da-Yin; Chang, Shi-Chung; Liao, Da-Yin |