| 國立交通大學 |
2014-12-08T15:27:48Z |
Two-level virtual mesh refinement algorithm in a parallelized DSMC Code using unstructured grids
|
Su, C. C.; Tseng, K. C.; Wu, J. S.; Cave, H. M.; Jermy, M. C.; Lian, Y. Y. |
| 國立交通大學 |
2014-12-08T15:27:25Z |
Two-level web agent for limited accessibility
|
Yeh, PJ; Yuan, SM; Lo, W |
| 臺大學術典藏 |
2021-02-04T02:48:49Z |
Two-liquid electroosmotic thrusters for micro propulsion applications
|
Huang, K.-H.; Huang, H.-F.; Huang, K.-H.; Huang, H.-F.; HSIN-FU HUANG |
| 國立臺灣大學 |
1993 |
Two-loop contributions of flavor-changing neutral Higgs bosons to μ→eγ
|
Chang, D.; Hou, W. S.; Keung, W. -Y. |
| 臺大學術典藏 |
2019-12-27T06:47:47Z |
Two-loop contributions of flavor-changing neutral Higgs bosons to μ→eγ
|
Chang, D.; Chang, D.; WEI-SHU HOU et al. |
| 國立成功大學 |
2000-12-28 |
Two-loop effective potential in noncommutative scalar field theory
|
Huang, Wung-Hong |
| 國立成功大學 |
1986-02 |
Two-Loop Feynman Integrals in the Physical Light-Cone Gauge
|
Leibbrandt, George; Nyeo, Su-Long |
| 國立臺灣科技大學 |
2015 |
Two-loop PID control using PSO-RGA algorithm for solar heat pumps
|
Tsai, C.-C.;Tsai, K.-I.;Hsu, S.-C.;Su, Su S.-F. |
| 國立成功大學 |
2021 |
Two-loop radiative seesaw, muon g − 2, and τ-lepton-flavor violation with DM constraints
|
Chen, Chen C.-H.;Nomura, T. |
| 國立成功大學 |
2021-09-16 |
Two-loop radiative seesaw, muon g-2, and tau-lepton-flavor violation with DM constraints
|
Chen;Chuan-Hung;Nomura;Takaaki |
| 國立交通大學 |
2014-12-08T15:28:44Z |
Two-machine flow shop scheduling of polyurethane foam production
|
Lin, Bertrand M. T.; Lin, Y-Y; Fang, K-T |
| 國立暨南國際大學 |
2006 |
Two-machine flow-shop scheduling to minimize total late work
|
李家同?; Lee, RCT |
| 國立暨南國際大學 |
2006 |
Two-machine flow-shop scheduling to minimize total late work
|
林峰正; Lin, FC |
| 國立交通大學 |
2014-12-08T15:16:29Z |
Two-machine flow-shop scheduling to minimize total late work
|
Lin, BMT; Lin, FC; Lee, RCT |
| 國立交通大學 |
2014-12-08T15:37:05Z |
Two-machine flowshop batching and scheduling
|
Lin, BMT; Cheng, TCE |
| 國立臺灣海洋大學 |
2007-10 |
Two-machine flowshop scheduling to minimize mean flow time under simple linear deterioration
|
Yau-Ren Shiau; Wen-Chiung Lee; Chin-Chia Wu; Chia-Ming Chang |
| 國立交通大學 |
2014-12-08T15:46:24Z |
Two-machine flowshop scheduling with bicriteria problem
|
Chou, FD; Lee, CE |
| 國立交通大學 |
2018-08-21T05:53:59Z |
Two-machine flowshop scheduling with three-operation jobs subject to a fixed job sequence
|
Lin, Bertrand M. T.; Hwang, F. J.; Gupta, Jatinder N. D. |
| 國立成功大學 |
2011-10 |
Two-machine flowshop scheduling with truncated learning to minimize the total completion time
|
Li, Der-Chiang |
| 朝陽科技大學 |
2022-11 |
Two-Machine Open Shop Scheduling with Proportionally Deteriorating Jobs and Makespan Objective
|
Liaw, Ching-Fang |
| 國立交通大學 |
2018-08-21T05:53:30Z |
Two-Mass Vehicle Model for Extracting Bridge Frequencies
|
Yang, Judy P.; Chen, Bo-How |
| 國立成功大學 |
1993 |
Two-mode InGaSb/GaSb strained-layer superlattice infrared photodetector
|
Chen, Shi-Ming; Su, Yan-Kuin; Lu, Yan-Ten |
| 國立交通大學 |
2019-04-03T06:47:35Z |
Two-Mode Semiconductor Laser for mm-Wave in Radio over Fiber Transmission
|
Yeh, C. H.; Chow, C. W.; Wu, Y. F.; Shih, F. Y.; Wang, C. H.; Chi, S. |
| 臺大學術典藏 |
2022-04-28T08:06:26Z |
Two-month breathing-based walking improves anxiety, depression, dyspnoea and quality of life in chronic obstructive pulmonary disease: A randomised controlled study
|
Lin F.-L.; Yeh M.-L.; YEUR-HUR LAI; Lin K.-C.; Yu C.-J.; Chang J.-S. |
| 臺大學術典藏 |
2022-06-27T06:59:50Z |
Two-month breathing-based walking improves anxiety, depression, dyspnoea and quality of life in chronic obstructive pulmonary disease: A randomised controlled study
|
Lin F.-L.; Yeh M.-L.; Lai Y.-H.; Lin K.-C.; CHONG-JEN YU; Chang J.-S. |